Download presentation
Presentation is loading. Please wait.
1
Wunderlich-Malec Engineering, Inc.
THINK AUTOMATION®. Innovative Water Technologies Technology Committee January 23, 2018
2
Agenda Wunderlich-Malec Engineering Overview
Value of Strategic Partnerships Best Practices for SCADA and PLC Case Study City of Longmont
3
About Wunderlich-Malec Engineering
Founded in 1981 Full Service Engineering and Systems Integration Professional Registration in 42 states 450 Employees 35 Engineers locally Employee Owned
4
Strategic Partnership
Engineering/Automation partner Technologies from Multiple Industries Water/Wastewater experience National team including local BU Central Panel Shop Standards Volume purchasing Operations and Project Support Water & Wastewater Partners City of Longmont Parker Water Denver Water South Adams County City of Castle Rock
5
Best Practices Standard Methodology = Value Control Narratives
Software modules and tools SCADA & PLC hardware/software
6
Best Practices Control Narrative Document Control Overview
Alarm conditions and limits SCADA Screens Design Detailed Functionality Hardware design Training
7
Best Practices Software Standards Control Module Library
Standard Process controls High Performance Graphics Alarm configuration Alarm Analytics Asset Based Design
8
Best Practices High Performance Graphics
9
Best Practices Alarm Configuration
10
Best Practices Alarm Analytics
11
Best Practices Asset Based Design – Operator Queries
12
Case Study – City of Longmont
Long standing Partnership Assessment of current state Developed Standard software tools Control Narrative Automated processes Developed Disaster Recovery Program Reduced support requirement - Simplified project implementation Example Projects SCADA & PLC upgrades Development of SQL Reports WWTP Headworks Upgrade WWTP Dewatering and Ammonia Mitigation Project Multiple Process Improvements Automated Filter Backwash, Plant shutdown and Restart
13
Summary Standards and Best Practices Strategic Partnerships
Control Narratives Software Design and Modules High Performance Graphics Asset based approach Strategic Partnerships Implement Standards Technology Updates Operations and Project support
14
For additional information, please contact:
Questions? For additional information, please contact: Scott Kastman, Business Development Manager
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.