Download presentation
Presentation is loading. Please wait.
Published byGrace Culbertson Modified over 10 years ago
1
Clean Room Plans Monday, August 23, 2004
2
--- Hybrids--- Frames--- SensorsModules
3
Monday, August 23, 2004Prepared by: Kirsten Affolder, UCSB Storage Plan Hybrid inspection and plating in small clean room (to make more space in testing room) Hybrid boxes will be labeled with batch number Plated hybrids stored in big clean room Bonded and tested hybrids stored in testing room Sensors will have dedicated cabinet in clean room Frames will be stored in anteroom cabinet Tested modules will be moved to high bay daily and stored there until rod assembly Fast track modules will have separate holding area in a cabinet in high bay
4
Monday, August 23, 2004Prepared by: Kirsten Affolder, UCSB Shipping/Receiving Duties Unpack, sort, store all components Prepare components for production Inspect and plate hybrids Inspect and barcode frames Sort and pair sensors Transport modules in and out of clean room (for gluing, testing, rod assembly) Gluing modules in small clean room Stock gantry cabinet with one weeks production components Prepare all shipments (e.g., TEC modules to Europe)
5
Monday, August 23, 2004Prepared by: Kirsten Affolder, UCSB To-Do List Order 3 more cabinets and some extra shelves Move small cabinets out of clean room into anteroom Remove printer and set up computer in anteroom Move hybrid inspection materials to small clean room Build cart for transporting modules in and out of clean room Rearrange some clean room and testing room cabinets Set up inventory database of usable-only components
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.