Download presentation
Presentation is loading. Please wait.
Published bySusanti Salim Modified over 6 years ago
1
Thermoflow Inc. This tutorial is a PowerPoint® file which includes recorded narration. Automatic slide sequencing is coupled to the sound track. For the most effective use, please ensure that your computer is equipped with a sound card and that it is activated. If you cannot hear this message from your computer’s speakers, please connect them. Should there be an excessive delay between slides, press the spacebar to proceed.
2
ASAP Plant conditions: 120 – 150 MW
Pure combined cycle – no process steam “Greenfield” site – Midwest USA By river – once through cooling Use ISO ambient conditions Need plant output, fuel consumption, rough construction costs, and plant layout ASAP
28
40
34
Gas Flow
36
Area with red border is zoomed-out view of HX Locations & Duties input panel.
44
1.0
71
Output sheets
72
In less than 15 minutes, you have an accurate heat balance, plot plan, and rough cost estimate using Thermoflow’s GTPRO software !
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.