Introduction - Need for Better Salt Water Treatment
Resource Recovery – can sell any captured oil Avoid primary plugging of down-hole areas by oil Avoid secondary plugging by bacterial growth
3
Two Sets of Separation Equipment Required
Primary separation at or near the wellhead Usually pressurized May or may not be equipped with sand removal systems May include heater-treaters Salt water disposal system for recovering residual oil
4
Wellhead Typical Three Phase Separator
5
Typical Gunbarrel Separator
6
Wellhead Separation Equipment
Three phase separators Good rough-cut separation system Gunbarrel separators Mostly empty tank type system Both are relatively inexpensive, low-maintenance and simple to operate Neither are designed to capture small oil droplets and not very efficient
7
Separation by Gravity Separation governed by Stokes’s Law
8
Stokes’s Law Variables
Variables are Density of Droplets Density of the Water Viscosity of continuous phase (temperature) Average Droplet size (Squared function)
9
Stokes’s Assumptions Laminar Flow Consistent specific gravity
Spherical Particles Consistent particle size Droplets are large enough to avoid Brownian Motion flow regime
10
Information needed for Disposal System Design
Design flow rate Design inlet oil content and gravity Design water specific gravity Design operating temperature range Oil outlet concentration desired Design solids content Design solids type / configuration Possible variations in the parameters
11
Design Flow Rate Design flow rate determined on an instantaneous (gpm or equal) basis BPD if 24 hour operation 30, ,000 BPD is a reasonable large size For larger flows, use multiple units Design for maximum flow expected – performance will be better at lower flows
12
Design Inlet oil Content / Specific Gravity
If analyses are available, use highest oil content found. If no analyses, use 5% as maximum oil content. If specific gravity is available, use that If gravity is unknown, use literature value for that field or get a sample tested
13
Design Operating Water Temperature
In general, higher temperature is better up to about 150 F (65 C). Higher water temperature is better because the viscosity of the water is less at higher temperature But, at higher temperatures convection and other currents will be worse and may cause separation problems. Check with the possible water sources for temperatures
14
Design Oil Removal Can’t get to ZERO ppm oil in effluent, but can get to “non-detect” levels (about 2 ppm) Better oil removal brings more oil to sell and also reduces operating costs Can only get down to droplets about micrometers in diameter (Brownian Motion) Volume of oil in a droplet depends on the cube of the diameter
15
Design Inlet Solids Content
Solid content in the inlet will vary wildly from one truck to the next Take samples for analysis if possible. If it is not possible to get samples for analysis, estimate 50 ppm solids. If the solids content is eventually proven to be more, add solids settling capacity
16
Variations in Parameters
Some parameters are not likely to change substantially: Oil specific gravity Removal required Some parameters will change substantially: Flow rate Operating water temperature
17
Design choices Instantaneous flow rate
Surge capacity / solids and oil retention volume Piping sizes Flow Scheme and Separations system Can centrifugal pumps be avoided?
18
Instantaneous flow rate
Treatment systems operate on an instantaneous basis – not a barrels per year basis This basis should be determined using the maximum flow expected
19
Tank Capacity Inlet tank capacity should be sufficient to contain:
Water to allow for up to two days of operation Oil content of up to 5% for two days of operation Solids storage sufficient for 50 mg/l for two days of operation Total = sum of above
20
Piping Flow Capacity Make sure the piping system from the inlet of the overall system to the injection pump is large enough for the flow Use large pipe to avoid pressure drops which cost energy and degrade droplet size distributions If piping is too small, water will back up in the inlet tankage Avoid centrifugal pumps if possible
21
Separation System Design
Systems should be designed to remove substantially all of the oil present in the inlet Coalescing plate separators work well Really good oil removal will preclude bacterial growth in the system, final filter, and downhole formation.
22
Bacterial growth inhibition
Inefficient oil removal Efficient Oil Removal Large bacterial growth Minimal bacteria growth
23
Permian Basin Pilot Testing
Inlet and Outlet Samples – two sets
24
Design of Full Scale Unit
Based on 500 barrel Frac Tank 1050 gpm (36,000 bpd) water flow Capacity:1-7 rows of media West Texas light crude 0.82 S.G. Designed for 50 mg/l out with 2000 mg/l inlet concentration with three rows of media Can add additional rows if necessary for more flow or lower effluent
25
Frac Tank Based Separator
Flow rate approximately 36,000 bpd
26
Frac Tank Based Separator
27
Permian Basin Installation
28
Test Results, Full Scale Unit
Full Scale Unit Operations Test Results, Full Scale Unit Inlet Hydrocarbon Concentration Outlet Hydrocarbon Concentration 90 mg/l 13 mg/l 85 mg/l 14 mg/l 119 mg/l 7 mg/l
29
Coalescing Plate Systems
Gravity operated High efficiency Predictable oil removal Design for whatever maximum effluent is allowed Much smaller than other separators for same flow rate Plates are not consumed – last years Recovered oil can be sold
30
How is Maintenance Improved?
Extend periods between filter changes Reduce filter change cost and labor Reduce wear and tear on injection pump Reduce downhole plugging and workover requirements Reduce plugging due to oil in injection water Reduce plugging due to bacterial growth
31
Summary and Conclusions
Recover oil that would otherwise be lost Minimize plugging of final filter – reduce filter changes Reduce plugging of disposal well by oil Reduce plugging of well by bacteria Improve operations and reduce workover and maintenance requirements
32
DESIGNING SALTWATER DISPOSAL SYSTEMS FOR OPTIMAL OIL RECOVERY AND MINIMUM MAINTENANCE
Questions? If you would like a transcript of this presentation, please leave your business card and I will send one.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.