Download presentation
Presentation is loading. Please wait.
Published byLiana Sasmita Modified over 5 years ago
1
Light Communications Study Group March 2018 Closing Report
Date: Author: John Li (Huawei)
2
March 2018 Abstract This presentation contains the IEEE Light Communications Study Group closing report for the March 2018 session. John Li (Huawei)
3
May 2015 doc.: IEEE /0496r1 March 2018 Work Completed Responses to IEEE 802 comments against draft PAR and CSD completed. One SG motion was passed to approve the responses to IEEE 802 comments against draft PAR and CSD Two SG motions were passed to approve the revised PAR and CSD to be forwarded to the WG Revised PAR(doc /1604r09) Revised CSD(doc /1603r08) 1 submission on LC modulation schemes was treated Doc /556r0 “Modulation schemes for optical wireless communications” John Li (pureLiFi) Edward Au (Marvell Semiconductor)
4
Motion of SG approval of response to PAR/CSD comment
March 2018 Motion of SG approval of response to PAR/CSD comment Approve the LC PAR and CSD comment responses in and forward to the 802 EC Moved: Tuncer Baykas Seconded: Sang-Kyu Lim Result: Y: [ 28], N: [0 ], A: [0 ]; Motion passes John Li (Huawei)
5
Motion of SG approval of PAR
March 2018 Motion of SG approval of PAR Believing that the PAR contained in the document referenced below meets IEEE-SA guidelines, Request that the PAR contained in [doc /1604r09] be submitted to the IEEE WG approval and submit to IEEE 802 EC for approval to submit to NesCom. Moved: Tuncer Baykas Seconded: Volker Jungnickel Result: Y: [ 24], N: [0 ], A: [ 2], Motion passes John Li (Huawei)
6
Motion of SG approval of CSD
March 2018 Motion of SG approval of CSD Believing that the CSD contained in the document referenced below meets IEEE 802 guidelines, Request that the CSD contained in [doc /1603r08] be submitted to the IEEE WG approval and submit to IEEE 802 EC for approval. Moved: Gaurav Patwardhan Seconded: Sang-Kyu Lim Result: Y: [24 ], N: [0 ], A: [ 1], Motion passes John Li (Huawei)
7
March 2018 Goals for May 2018 interim Discuss time line and working principles for potential TG Presentations John Li (Huawei)
8
Teleconference schedule
March 2018 Teleconference schedule Will schedule with 10-day notice John Li (Huawei)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.