Presentation is loading. Please wait.

Presentation is loading. Please wait.

Landfill Wernsdorf, construction areas 3 and 4

Similar presentations


Presentation on theme: "Landfill Wernsdorf, construction areas 3 and 4"— Presentation transcript:

1 Landfill Wernsdorf, construction areas 3 and 4
STRABAG Umwelttechnik GmbH Landfill construction Landfill Wernsdorf, construction areas 3 and 4 Facts city (country) Königs-Wusterhausen (Germany) Client: BSR, Berlin (Germany) contractor: STRABAG Umwelttechnik GmbH, Düsseldorf (Germany) Engineering: ICU, Berlin (Germany) Contract value: 6.89 million EUR Construction period: 04/2011 ─ 11/2012 Recultivation of a landfill by construction of landfill capping system, consisting of: 81,541 m² Levelling layer, 15 cm thick 165,916 m² Supply and laying of geomembrane 82,958 m² Supply and laying of geotextile 800 g/m² 93,999 m² Supply and laying of drainage mat 1,650 m² Drainage layer, 30 cm thick 66,998 m² Supply and filling of subsoil, 70 cm thick 65,696 m² Supply and filling of topsoil, 25 cm thick 13,561 m³ Supply and installation of additional drainage areas 41,081 m² Supply and laying of protection geotextile Road construction and landfill infrastructure (ditches, degassing system and seepage areas)


Download ppt "Landfill Wernsdorf, construction areas 3 and 4"

Similar presentations


Ads by Google