NWF Fuels – Nunn Brook Road, Huthwaite Fuel Distribution yard with storage tanks and offices
Value of contract: Length of contract: Contract start date: Completion date: £260,000 4 months June 2014 October 2014 Works/services provided: Mechanical & electrical installations for two storey offices Hydraulic Box shutters and steel formwork Precast Concrete Piled Foundations up to 8m deep Lay in grid suspended ceilings and plaster finishes 1m deep Concrete Pile Cap / fuel tank base Internal joinery Installation of Fuel Interceptors & control systems Sanitary ware Installations Kitchen fit out, fixtures and fittings Heavy Duty surface water drainage system Floor finishes and complete decoration 2500m² goods vehicle yard in reinforced concrete to withstand fuel tankers Detailed description of contract: Construction of a Commercial goods yard for ‘24/7’ Fuel distribution business to encompass all environmental factors and user safety features. Alteration and refurbishment of two storey office block to accommodate technical sales, administrational and operational staff associated with the business. Particular challenges to be overcome: Contact details: Deep excavations in made up and contaminated ground Working in confined spaces Programming a large external works package to achieve completion to a very tight delivery deadline, factoring in elements such as long lead delivery and poor weather Mr Mark Nicholls NWF Fuels Wardle Nantwhich Cheshire. CW5 6AF Tel:
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.