Why you dont need to learn Japanese to become Lean
2
Kan Ban Kaizen Six Sigma
3
Kan Ban Kaizen Six Sigma Custom Shop Lean
4
Kan Ban Kaizen Six Sigma Custom Shop Lean Company Mindset, not Rules
5
Kan Ban Kaizen Six Sigma Custom Shop Lean Company Mindset, not Rules How Can We Do This Better?
6
Every Employee Every Task Every Day
7
Sort through each work station.
8
Set things in order.
9
Sort through each work station. Set things in order. Shine and inspect.
10
Sort through each work station. Set things in order. Shine and inspect. Standardize as much as practical.
11
Sort through each work station. Set things in order. Shine and inspect. Standardize as much as practical. Sustain through inspection.
13
A goal of 50% increase in production
14
Applying the 5Ss
15
A goal of 50% increase in production Applying the 5Ss Low hanging fruit
16
A goal of 50% increase in production Applying the 5Ss Low hanging fruit Central Tool room – Work station storage
17
A goal of 50% increase in production Applying the 5Ss Low hanging fruit Central Tool room – Work station storage Repetitive task set-ups
18
Change is frightening
19
Be honest and clear
20
Change is frightening Be honest and clear Engage key team members
21
Change is frightening Be honest and clear Engage key team members Spread engagement to the entire staff
22
Equipment condition
23
Operator training
24
Equipment condition Operator training Floor plan
25
Equipment condition Operator training Floor plan Common tasks
26
Equipment condition Operator training Floor plan Common tasks Follow the work flow
27
No More Tape Measures! CNC programming changes
28
No More Tape Measures! CNC programming changes Standardize hardware and construction
29
No More Tape Measures! CNC programming changes Standardize hardware and construction Assembly receives kits
30
No More Tape Measures! CNC programming changes Standardize hardware and construction Assembly receives kits Single unit batching
31
Assembly begins immediately
32
Errors detected very early
33
Assembly begins immediately Errors detected very early Material handling drastically reduced
34
Assembly begins immediately Errors detected very early Material handling drastically reduced Maximize time flexibility
35
Custom means being flexible
36
Fast changes
37
Custom means being flexible Fast changes Machines as well as work stations
38
Constant review
39
Use savings for capital equipment
40
Constant review Use savings for capital equipment Due diligence- will it work with your evolving system?
41
Feedback is needed to review changes
42
Honesty from top- down
43
Feedback is needed to review changes Honesty from top- down Build confidence and trust among the team
44
Feedback is needed to review changes Honesty from top- down Build confidence and trust among the team Confident team members feed back accurately
45
Feedback is needed to review changes Honesty from top- down Build confidence and trust among the team Confident team members feed back accurately Communicate with EVERYONE
46
Delegate tasks to the team
47
Permission to fail fast and cheap
48
Delegate tasks to the team Permission to fail fast and cheap Your office should be lean too
50
1. What was prospected today? 2. What was conceptualized to move a project forward? 3. What was produced to move a project forward? 4. What was done that can be invoiced? 5. What distractions occurred today? Track Progress
51
Keep it Simple Search out waste: Wasted materials Wasted money Wasted time Ralph Bagnall www.consultingwoodworker.com