Download presentation
Presentation is loading. Please wait.
1
Management and control & financial corrections
16 July 2013
2
State of play of negotiations
Management and control – agreed between co-legislators (designation criteria only last week) Financial corrections –part of the financial management block, negotiations are ongoing, certain issues are still open Performance framework – negotiations are ongoing, notably because of the link to the performance reserve ! Fiches on financial corrections in particular are without prejudice to the outcome of the negotiations
3
Delegated and implementing acts
Provision Type of act Content Presented 112 (2) DA Irregularities to be reported, data to be provided etc. Autumn 2013 IA Frequency of reporting irregularities, reporting format 112 (3) E-cohesion – detailed rules √ 113 (bis) Designation of authorities: model for system description, audit report and opinion September 2013
4
Delegated and implementing acts
Provision Type of act Content Presented 114 (8) DA Data to be recorded by MA in computerised form Autumn 2013 (potentially September) IA Technical specification of monitoring system 114 (9) Audit trail: minimum requirements Today 114 (10) Model for management declaration
5
Delegated and implementing acts
Provision Type of act Content Presented 116 (6) IA Models for audit strategy, control report, audit opinion Today 116 (7 new) DA Scope of audits, sampling methodology Autumn 2013 116 (7) Use of data collected during audits 132 (4) Accepted data carriers 136 (6) – link to Art. 20 (4) Criteria for financial corrections Today (NB:under discussion in trilogues)
6
Delegated and implementing acts
Provision Type of act Content Presented 136 (7) IA Methodology for flat rate and extrapolated financial corrections TBD (Under discussion in trilogues) 137 (6) DA Criteria and main types of serious deficiencies that might lead to net corrections
7
Next steps Written comments to fiches within 3 weeks
Next meetings in September and October (dates TBC) COM to prepare drafts on remaining DA and IA: priority is given to acts related to designation and information systems Aim is to discuss all empowerments twice in the expert group
8
Written comments can be sent until 9 August to:
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.