Presentation is loading. Please wait.

Presentation is loading. Please wait.

THE PROCESS FOR REPORTING ABNORMALITIES

Similar presentations


Presentation on theme: "THE PROCESS FOR REPORTING ABNORMALITIES"— Presentation transcript:

1 THE PROCESS FOR REPORTING ABNORMALITIES
Something different from the usual (shape, colour, scratches etc) Something strange ( movement, pressure, weight) Wrong product, part number, different to kanban Control condition different to the SOS What is an abnormality? When to report? Immediately on finding the first item inform Your Team Leader next process engineering Report route Operator T/L QA Eng Line Leader Plant mgr previous process Inspection Operator Team Leader QA Engineer Report at the time of discovery Receive correction instruction Identify the abnormality Check the report and report to QA Engineer Give correction instruction to operator Confirm the effect on subsequent processes Check the content of the defect or abnormality Give directions for handling Confirm after corrective measures are implemented Check the effect for the customer Escalate issue if required Reporting rules and area of responsibility


Download ppt "THE PROCESS FOR REPORTING ABNORMALITIES"

Similar presentations


Ads by Google