Download presentation
Presentation is loading. Please wait.
Published byEbony Charters Modified over 10 years ago
1
SCHH Computer Club Treasurers Report February 8, 2007
2
Feb 1, 2007 Opening Balances Liberty Bank Checking$10,150.76 Treasury Bills$80,000.00 Petty Cash$ 36.21 TOTAL FUNDS – 01/01/06 $90,186.97
3
January 2007 Income Membership Dues$5,820.00 Education Classes$1,260.00 Printing Fees$.00 Interest Income –Treasury Bills $ 313.88 –Liberty Bank $ 6.16 TOTAL INCOME$ 7,400.04
4
January 2007 Expenses Administration$ 82.44 Hardware$ 368.27 Printer Supplies$ 51.34 Software$ 194.10 Subscriptions$ 48.00 TOTAL$ 744.15
5
January 2007 Treasury Bill Activity Opening Balance$ 80,000 February2006 Additions$ 5,000 End of February Balance$ 85,000
6
January 31, 2007 Balances Liberty Bank Checking$ 16,806.56 Treasury Bills$ 80,000.00 Petty Cash$ 36.21 TOTAL FUNDS – 1/31/07$ 96,842.86
7
SCHH Computer Club 2007 Budget
8
2007 Opening Balances Liberty Bank Checking$10,150.76 Treasury Bills$80,000.00 Petty Cash$ 36.21 TOTAL FUNDS – 01/01/06 $90,186.97
9
2007 Planned Income Membership Dues$22,000 Education Classes$ 5,500 Printing Fees$ 600 Interest Income –Treasury Bills $ 3,800 –Liberty Bank Checking $ 50 TOTAL INCOME$ 31,950
10
2007 Planned Expenses [1 – 2] Administration$ 445 Education$ 1,350 Hardware$ 9,580 Membership$ 315 Printing$ 1,025 Printer Supplies$ 1,065 Program$ 2,090
11
2007 Planned Expenses [2 - 2] Software$ 5,091 Computer Room Cleaning$ 1,550 Special Events$ 4,950 Subscriptions$ 760 TOTAL EXPENSES $28,221 TOTAL GAIN$ 3,729
12
2007 Year-End Balances Liberty Bank Checking$ 9,890.36 Treasury Bills$ 85,000.00 Petty Cash$.00 TOTAL FUNDS – 12/31/07$ 94,890.36
13
Key Issues for 2007 Budget for New Computer Club Room [Est. Late 1 st Quarter 2008 Install] Develop Budget for Reserve Requirements Review Annual Dues Rate Again
14
SCHH Computer Club Proposed Budget New Computer Room
15
Supplied By Del Webb/Pulte A Large Room [46ft X 26ft] –Walls –Ceiling with Connections for Mounted Projector –Two Lockable Closets [6ft X 6ft] –Lighting w/Dimmers –Electrical Outlets A Folding Partition to Allow Separate Classroom A Raised Floor [Allows Wiring to be Hidden]
16
Computer Club Requests DSL & Cable TV outlets Phone Outlet at Monitor Desk Heavy Duty Air Conditioning – Power Usage Dimmable Lighting Opaque Back on Showcase [Limit Light] Install Ceiling Mounted Projector & Projection Screen Raised Flooring Folding Wall to Establish Two Rooms, when Needed
17
PC, Mac, or Space for Laptop Laser Printer Scanner & Photo Printer Printing Supplies Underneath Phone Monitor Showcase Screen Storage Cab (Desk Height) Storage Room 30 5556 45 6 ID 28 6 ID16 8 ID 4 8 7 3 85 6 5 4 29 4 ID Instructor Folded Wall Folding Wall 3 ½ OD Cable Chase in wall (for future needs) 110 VAC 20 A (most under raised floor) Clock outlet and hanger above door Clock outlet and hanger on wall In ceiling for projector
18
What Do We Need to Buy? New Workstation Furniture [Tables & Chairs] New Cabinets for Printers/Scanners New Computers [Est. 20 PCs and 3 MACs] New & Upgraded Software New Printers / Scanners Cabling, Routers, UPS, and Surge Protectors Mountable Projection Screen
19
What Will Furniture Cost? Workstations –Two Station Tables [18 @ $438]$ 7,884 –Work Station Chairs [32 @ $173]$ 5,536 Storage Cabinets [3 @ $800]$ 2,400 FURNITURE TOTALS$15,820
20
What Will Computers Cost? Computers –PCs [Primarily Desktops] – 20 @ $2,000$ 40,000 –MACs – 3 @ $2,500$ 7,500 TOTAL COMPUTERS$ 47,500
21
What Will Software Cost? Software –Office Suite – 23 @ $147$ 3,381 –Other Software – New & Upgrades$ 2,500 TOTAL SOFTWARE$ 5,881
22
What Will Electric & Network Cost? Electrical –Surge Protectors [16 @ $269]$ 4,304 –UPS [24 @ $98]$ 2,352 TOTAL ELECTRICAL$ 6,656 Networking –Routers [2 @ $295]$ 590 –Cabling [ 36 @ $10]$ 360 TOTAL NETWORK$ 950
23
What Will Miscellaneous Cost? Miscellaneous –Projection Screen$ 1.239 TOTAL MISCELLANEOUS$ 1,239
24
Cost Summary Furniture$ 15,820 Computers$ 47,500 Software$ 5,881 Electrical$ 6,656 Networking$ 950 Miscellaneous$ 1,239 Tax & Shipping$ 2,500 GRAND TOTAL$ 80,546
25
Annual Estimated Reserves for Replacement and Upgrade
26
Reserve Budget Normal Replacement Cycle for Computers is 3 – 4 Years CAM also notes that the Basic Insurance Policy for stolen or destroyed assets has a very high deductible. [ie Dont Plan on It] SCHHCC needs to plan for this contingency by Developing a Reserve Fund that will meet these replacement and upgrade needs.
27
Reserve Budget [2 – 2] Computers [Replace 6 per year] –Per Unit Cost $2000$ 12,000.00 Software Periodic Upgrades [O/S & Office] –Every 5 Years at $150 per $ 4,500.00 Annual Reserve Requirement $ 8,000.00
28
Reserve Budget [Time Phased] 2007$0,000$00,000$10,000 2008$8,000$00,000$18,000 2009$8,000$00,000$26,000 2010$8,000$12,000$22,000 2011$8,000$16,500$13,500 2012$8,000$12,000$ 9,500 Start 2008 with an Estimated $10,000. Start Budgeting in 2008. Review Reserve Amount in 2011
29
Any Questions or Comments?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.