Download presentation
Presentation is loading. Please wait.
Published byMaurice Todd Byrd Modified over 5 years ago
1
The project´s specifications, and the connection between the contract´s different specifications
3
Used for orientation about contract (Adm. Level) WORK SPECIFICATIONS:
CASE SPECIFICATIONS: Used for orientation about contract (Adm. Level) WORK SPECIFICATIONS: Used for pricing the contract (Executive Level –site, etc.) BUILDING COMPONENT SPECIFICATIONS: Used for execution of works on site (Operative Level) FOR THE WORKS CONTRACTOR´S OPERATTIVES (WORKERS) ON SITE FOR ORIENTATION OF ALL THE CONTRACTORS ON SITE FOR EACH SPECIFIC TRADE /WORKS CONTRACTOR ON SITE
4
WORK SPECIFICATIONS: Used for pricing the contract
BUILDING COMPONENT SPECIFICATIONS: Used for implementation of works on site
5
The Tender Forms (Bidding Forms) – on which the bid is to be submitted
LEVEL 1: FRONT PAGE LEVEL 2: SUMMARY OF WORKS LEVEL 3: BREAKDOWN
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.