1 West Campus Parking Deck & Roadway Update

2 Project Info 2006 West Campus Precinct Plan Master Plan
Gate 1: Programming

3 Project Info 2007 University Park Master Plan Update Master Plan
Gate 1: Programming

4 Project Info 2007 West End Plan – Borough of State College Master Plan
Gate 1: Programming

5 Project Info 2013 Downtown Master Plan – Borough of State College
Gate 1: Programming

6 Scope 2017/2018 West Campus Parking & Roadway Feasibility Study
Study completed to assess the feasibility of new deck and roadway construction (Tim Haas, McCormick Taylor, NTM Engineering) Evaluated siting and access to deck Developed program for number of spaces with replacement of surface lots for future academic buildings and increased demand Included evaluation of stormwater accommodations for both this scope and future build-out of West Campus Municipal and Agency Coordination Meeting included staff from Borough, Ferguson Township, CATA, CRPA, and PennDOT

7 Scope Program: West Campus Parking Structure & Roadway Connections
Located in Red A parking on West Campus Approx. 1,676 parking spaces (6 Tier) Covered bike storage on ground level CATA Bus Stop at Parking Structure Extension of White Course Drive New roadway connection from West College Avenue to provide access from West 2 Ingress/Egress locations for road connection from West College Ave and Atherton St Transit-only link considerations for roadway design

8 Project Info West Campus Parking Structure & Roadway Connections
Gate 1: Programming Potential Sites Ferguson Township State College Borough

9 Project Info West Campus Parking Structure & Roadway Connections
Gate 1: Programming

10 Project Info West Campus Parking Structure & Roadway Connections
Gate 1: Programming Ferguson Township State College Borough

11 Considerations West Campus Parking Structure & Roadway Connections
Parking Structure needs to be operational before work can start on new buildings that impact parking on West Campus Traffic Impact Study initiated in Spring to collect traffic data and while school is in session and prior to road work on Atherton Street Stormwater Basin expansion to accommodate both initial and future growth in West Campus Drainage Area Design/Build team to be selected in July to start design in early fall Final siting and access considerations to be influenced by on-going College of Engineering Master Plan

12 Project Info West Campus Parking Structure & Roadway Connections
Proposed Concept – Stormwater Basin