THE PROJECTs QSCB FUNDING
Board Meeting November 17, 2009 Prepared by: Dr. Washer Mr. Douglas Barge Mr. Art Hand, Jr. Y:BusService;BoardAgenda/ /B
2
Table of Contents Description Page No. Introduction 1
QSCB’s – Use of Proceeds Cost of Issuance Pays For? The Projects QSCB’s – The Repayment Plan Balancing the QSCB Program Board Direction Page No. 1 2 3 4 - 6 7 8 9 - i -
3
Introduction The District’s application for Qualified School Construction Bonds (QSCBs) funding was approved through the State lottery process on August 28, 2009. This will allow the District to borrow funds at zero percent interest for years. Our approved application will provide an estimated $4,390,000 of construction resources that can be used to make improvements at Lockeford, Lawrence and McNair. The remaining proceeds from the sale will pay for borrowing discounts and the cost of issuance. At end of that term the funds ($5.5M) must be repaid in full (by a trustee). Lodi was 1 of 43 districts receiving these awards. 1
4
QSCB’s – Use of Proceeds
Qualified School Construction Bonds USES Lockeford Addition McNair Field Improvements Lawrence Parking Cost of Issuance Total Uses $5,500,000 $4,350,000 500,000 110,000 $5,500,000 2
5
Cost of Issuance Pays For
Legal Services Note Rating Services Trustee Services Financial Consulting Services Document Printing Funding Reserve Insurance Contingency Cost of Issuance is limited to 2% of borrowing 3
6
The Lockeford Addition Project
Phase 1 and 2 of this project have been sustainably completed - including renovation of the existing administration building and completion of preliminary site work Work on Phases 3 and 4 Construction of 7 new classrooms/multipurpose/PE room and the conversion of the existing multi-purpose room to a library/computer lab - cannot begin until additional funding is made available, either through local or state sources With this funding in place the Lockeford Addition Project can move forward. 4
7
The McNair Field Renovation Project
Among the numerous deficiencies in the original McNair Construction was the grading and preparation of the grass playfields – situations that have lead to sometimes unplayable field conditions District efforts to maintain the fields in a safe condition have been extraordinary, but the base problems cannot be corrected without substantive additional work, including regrading, reseeding and sprinkler system relocations With this funding in place the necessary improvements to the McNair playfields can get started. 5
8
The Lawrence Addition Phase 3 Project
Phase 1 and 2 of the Lawrence Addition Project - portable relocation and construction of 20 new permanent classrooms – was finished in July 2008 Phase 3 of this project will provide planned and much-needed off-street staff/visitor parking, additional student drop-off area and a redefinition of the school’s main entrance With this funding in place the improvements to Lawrence School can be completed as planned 6
9
QSCB’s - The Repayment Plan
Estimated Annual Payments General Fund will secure payments Additional Funding Sources State School Construction Program Development Fees Measure K Total Repayment $375,260 $3,453,371 $1,989,424 $936,629 $6,379,424 7
10
Balancing the QSCB’s Program
$6,379,424 8
11
Staff Needs Direction Board Wishes to proceed with the sale of the bonds The Board will be asked to formally approve all the resolutions authorizing the transaction Construction planning can proceed Projects will be completed The Board is not interested at this time Projects will be delayed District will give up its eligibility to participate in the program Funding for the projects will have to be located Possible penalties with existing contractors 9
12
The End - ii -