Download presentation
Presentation is loading. Please wait.
1
North America Information & Control Committee
I&CC Liaison Report Japan Standards Spring 2009 Meetings 2/17/2019
2
Leadership Changes Sensor Actuator Bus Subcommittee: PCS Task Force:
Dan Judd (Arlington Laboratory) has resigned as subcommittee chair Rich Gwizdak (Canton Control Solutions) has been appointed as new subcommittee co-chair, serving with James Moyne (AMAT) PCS Task Force: Hazem Hajj (Intel) has resigned as task force leader Chris Maloney (Intel) has been appointed as new TF leader, serving with James Moyne (AMAT) 2/17/2019
3
Leadership Committee Co-chairs Technical Architects
David Bricker / Semitool Jack Ghiselli / Ghiselli Consulting Lance Rist / ISMI Technical Architects Gino Crispieri / ISMI 2/17/2019
4
Current Committee Structure
Information & Control Committee Sensor Actuator Bus Subcommittee Recipe and Parameter (RaP) Management TF Sunset ► Diagnostic Data Acquisition (DDA) TF Int’l Equipment Engineering (IEE) TF Vacuum Pump SDM TF Sunset ► XML NCS E54 TF Sort Map TF XML & Web-based Communication TF I&CC Standards Improvement TF (SITF) Process Control Systems (PCS) Architecture TF Data Quality (DQ) TF AMHS IBSEM TF GEM 300 TF 2/17/2019
5
Meeting Information Last meeting Next meeting
April 2, 2009 for NA Spring Meetings Milpitas, California Next meeting July 15, 2009 for SEMICON West San Francisco, California 2/17/2019
6
Document Review Summary Cycles 1 & 2
Superclean Passed as Balloted Passed with Editorial Changes Failed – Returned to Task Force - - - 4410C-LI1 4410C-LI2 4626A 4685-LI1 4685-LI3 4685-LI4 4685-LI5 4685-LI6 4686 4685-LI2 4729 Cycle 1 E87 Revs Cycle 2 E125.x, E134.x, E138 Revs E139.x Revs E40 & E5 Revs 2/17/2019
7
Yellow Ballots to be reviewed at SEMICON West 2009 Meetings [1/2]
* Voting Period – Cycle 4 * Document # Document Title Task Force 4507A Revisions to SEMI E133, Provisional Specification for Automated Process Control Systems Interface and SEMI E133.1, Provisional Specification for XML Messaging for Process Control Systems (PCS). Line item changes and enhancements to E133.1: Fault Detection XML Schema Enhancements and updates to E133.1 base schema as necessary PCS TF 4596 Revisions to: • SEMI E128, Provisional Specification for XML Message Structures • SEMI E125.1, Specification for SOAP Binding for Equipment Self Description (EqSD) • SEMI E132.1, Specifcation for SOAP Binding for Equipment Client Authentication and Authorization (ECA) • SEMI E134.1, Specification for Soap Binding of Data Collection Management (DCM) • SEMI E147, Guide for Equipment Data Acquisition (EDA) DDA TF 4693 Revision to SEMI E133, Provisional Specification for Automated Process Control Systems Interface. Line item changes to E133 to provide specification for wafer to wafer (W2W) control. 4743 New Standard: Specification for Communication of Data Quality Data Quality TF 4744 Revision to SEMI E148, Specification for Time Synchronization and Definition of the TS-Clock Object 2/17/2019
8
Yellow Ballots to be reviewed at SEMICON West 2009 Meetings [1/2]
* Voting Period – Cycle 4 * Document # Document Title Task Force 4745 Reapproval of SEMI E54.13, Specification for Sensor/Actuator Network Communications for Ethernet/IP(TM) NA I&C Committee 4746 Reapproval of SEMI E91, Specification for Prober Specific Equipment Model (PSEM) 4747 Reapprovals for SEMI E122, Standard for Tester Equipment Specific Equipment Model (TSEM) and SEMI E122.1, Specification for SECS-II Protocol for Tester Specific Equipment Model (TSEM) 4748 Reapprovals of SEMI E123, Standard for Handler Equipment Specific Equipment Model (HSEM) and SEMI E123.1, Specification for SECS-II Protocol for Handler Specific Equipment Model (HSEM) 4749 Reapprovals of SEMI E39, Object Services Standard: Concepts, Behavior, and Services and SEMI E39.1, SECS-II Protocol for Object Services Standard (OSS) 4750 Withdrawal for SEMI E37.2, High-Speed SECS Message Services General Session (HSMS-GS) 4751 Withdrawals for SEMI E58, Automated Reliability, Availability, and Maintainability Standard (ARAMS): Concepts, Behavior, and Services and SEMI E58.1, SECS-II Protocol for Automated Reliability, Availability, and Maintainability Standard (ARAMS): Concepts, Behavior, and Services 2/17/2019
9
Task Force Updates Sensor Actuator Bus SC Data Quality TF
Vacuum Pump TF and XML NCS E54 TF have been disbanded Data Quality TF New SNARF’s : (4743) Communication of Data Quality (4744) E148 revision (time synchronization) 2/17/2019
10
Task Force Updates [continued]
Diagnostic Data Acquisition (DDA) TF Revised SNARF for E128 / E125.1 / E132.1 / E134.1 / E147 revisions (4596) GEM300 TF New SNARF for Recipe Execution Tracking (4742) TF and co-chairs in discussion with Korea Factory Automation WG on error codes for recipe parameter problems Discussion may result in SNARF proposal 2/17/2019
11
Task Force Updates [continued]
Process Control Systems (PCS) TF Revised E133 SNARFs and planned ballot submission for West 2009: Fault Prediction Enhancements Wafer-to-wafer control Recipe and Parameter (RaP) TF Monitoring DDA TF efforts on SOAP updates. Once completed, then plan E139 updates. No meeting planned for SEMICON West. 2/17/2019
12
Task Force Updates [continued]
International Equipment Engineering (IEE) TF Plan to sunset at West 2009 Previously planned to be replaced by NGF (Next Generation Factory) TF. However, NGF discussion being pushed back because of economic conditions Standards Improvement Task Force (SITF) May revive TF if there is a need, otherwise issues will be raised directly to NA I&C Committee XML Task Force Working with other task forces needing help on XML 2/17/2019
13
NA I&C Standards due for 5-Year Review [1/2]
Reapproval ballots for SEMICON West: E54.13 (Ethernet/IP) E91 (PSEM) E122 / E122.1 (TSEM) E123 / E123.1 (HSEM) E39 (Object Services) Withdrawal ballots for SEMICON West: E37.2 (High-speed SECS message services) E58 / E58.1 (ARAMS) 2/17/2019
14
NA I&C Standards due for 5-Year Review [2/2]
“In Limbo” documents to be discussed further via I&C GCS: E32 / E32.1 (material movement) E41 / E41.1 (exception management) E86 (CIM framework factory labor) E105 (CIM framework scheduling) E107 (electric failure, yield management) 2/17/2019
15
NA I&CC West 2009 Meeting Schedule [DRAFT]
San Francisco Marriott Hotel Sunday, July 12 SITF (3:00 PM – 6:00 PM, if meeting) Sort Map (3:00 PM – 6:00 PM, if meeting) Monday, July 13 I&C GCS (8:00 AM – 9:30 AM) I&C Leadership (9:30 AM – 11:00 AM) GEM300 (11:00 AM – 6:00 PM) Data Quality (11:00 AM – 3:00 PM) PCS (3:00 PM – 6:00 PM) Tuesday, July 14 DDA (8:00 AM – 11:00 AM) AMHS (8:00 AM – 11:00 AM) XML (11:00 AM – 3:00 PM) Sensor Bus (11:00 AM – 3:00 PM) IEE (3:00 PM – 6:00 PM) Wednesday, July 15 I&C Committee (8:00 AM – 5:00 PM) Committee meeting on Wednesday 2/17/2019
16
Thank You! For more information or participate in any NA I&C activities, please contact Paul Trio at SEMI 2/17/2019
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.