Download presentation
Presentation is loading. Please wait.
1
Tusa Consulting Services Ben Hill County, Georgia Board of Commissioners Testing and Analysis
2
Introduction #1 – Confirm radio programming
#2 – Confirm licensing/ site ERP #3 – Confirm amplifier configuration #4 – Perform intermodulation/ co-location study #5 – Perform noise floor measurements #6 – Perform line sweeps
3
Task #1 - Radio Programming
Confirmed correct programming of basestations Sheriff’s Hospital Volunteer Fire Road Department County Jail Confirmed correct programming of mobiles Focused on Sheriff’s Office Confirmed correct programming of portables
4
Task #2 – ERP / FCC Licensing
Sheriff’s Office – Triangle Tower TX: RX: EMS – Hospital Tower TX: RX: Volunteer Fire – GA Forestry Tower TX: RX: Road Department TX: RX:
5
Task #2 – ERP / FCC Licensing
Sheriff’s Office – Triangle Tower TX: RX: Not licensed for Not an actual VHF frequency Should be one of these:
6
Task #3 – Amplifier Configuration
Confirmed Sheriff’s basestation and amplifier are operating within FCC licensed ERP.
7
Task #4 – Intermodulation Study
Intermod interference is a process in which multiple transmitted frequencies combine to produce a result that impairs receive performance. Sources can be other local or distant towers, but typically created from within the same site as receive system. Not the same as co-location interference. More to come with Task #4….
8
Task #5 - Effective Sensitivity
9
Task #6 - Perform Line Sweeps
‘System’ sweeps performed at each site Return Loss, Distance to Fault No issues found at any site
10
Task #4 – Co-Location Study
EMS Receive Frequency – MHz
11
Task #4 – Co-Location Study
Vol. Fire Receive Frequency – MHz
12
Task #4 – Co-Location Study
Road Dept. Receive Frequency – MHz
13
Task #4 – Co-Location Study
Sheriff’s Receive Frequency – MHz Statewide TX Frequency – MHz
14
Task #4 – Co-Location Study
Statewide Use of – MHz
15
Conclusion Sheriff needs to reprogram all radios to different currently licensed receive frequency: Relocate all agencies to centrally located tower with more height Conservation of resources Single improved site Vs. multiple/scattered/inadequate Single point of contact/ responsibility for preventative and corrective radio maintenance and system organization
16
Project Conclusion Testing and Analysis Report
17
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.