Electricity Provider Programs
California Heat Pump Water Heater Collaborative workshop Pacific Energy Center, San Francisco, October 22nd 2018 Owen Howlett (916)
2
CA Energy Provider HPWH Program Goals
14M households in CA, so eventual statewide need is close to 1M units/year for complete success. SCE has grasped the magnitude of the challenge—”Anticipate 1M HPWH in service by 2030”. Total CA energy provider program goals by year, excluding SCE, SDG&E, LADWP: Year 2019 2020 2021 2022 Total Program Goals 2,245 3190 3,620 5,000
3
CA Energy Provider HPWH Load Shifting Goals
Behind the Meter Storage (leg. mandate or board target for POUs) One 50 gallon HPWH is equivalent to approx. 1kWh of storage PG&E 6,600 units SMUD 5,500 units SCE approx. 5,000 ($1M budget ) Sonoma Clean Power 1,800 units
4
Load Shifting Opportunities
Vertically integrated utilities can pass generation savings on to customers by switching on storage HPWHs at times of overgeneration Storage increases GHG savings and utilization of renewables Using HPWH as storage opens up a new kind of ongoing relationship with the customer Storage maximizes societal cost, minimizes revenue loss Optimized to TOD rate Dynamic pricing Customer savings (relative to uncontrolled HPWH) $38 $38+X Utility avoided cost (societal savings) $2 $15
5
Prices Paid by our Customers
6
Utility Issues to Address
How to reduce prices quoted to customers (Volume effect? Direct install? Trade allies?) How to reduce complexity and lead time How to integrate HPWH into other programs, including res retrofits and EV, to maximize uptake and to defray panel changeout cost How to pass dynamic pricing to HPWHs, in practice How to increase customer desire / perceived need for this technology, and other electrification.