EN/STI investigations during LS1 in TDC2 and TCC2 TDC2: -TCSC (collimator) to be replaced if … TCC2: -Targets Stations T2-T4-T6 *Monitors and Target equipment *Cabling *Flow meters Annual maintenance To keep in mind for each operation: waste, contamination
2
TCSC in TDC2 To be replaced only if budget is allocated and dripping acid is stopped from falling onto the TCSC!! Needs: -RP -Transport -VSC -STI Conflicts: -Large radioactive vessel to transport
3
TARGET Stations T2-4-6 in TCC2 Moniteur TBIUBACMoniteur TBID Moteur blindage mobile Patch Panel Ventilateur Switchs Blindage mobile
4
Monitors and Target to replace Needs: -RP -Transport -STI Conflicts: -Large amount of radioactive assemblies to transport (x9) Only if BI budget accepted!
5
Cabling on Targets to replace Needs: -RP -BI -VSC -STI To replace To remove To keep
6
Flow meters to replace on T2-4-6 T2-T4 T6 Needs: -RP -CV -STI
7
Annual maintenance AccèsLigneDirec.Elec.Equipement Déplacement Fin de course RefroidissementVideRemarques Hor.Vert.Hor.Vert.DébitTemper. BA 80TCC2DBA 80BAC T2/ / /// TBIU T2 / /// TBID T2 / /// Eau T2//// / Ventilateur T2//// // Blindage D T2 / //// Blindage G T2 / //// BA 80TCC2DBA 80BAC T4/ / /// TBIU T4 / /// TBID T4 / /// Eau T4//// / Ventilateur T4//// // Blindage D T4 / //// Blindage G T4 / //// BA 80TCC2DBA 80BAC T6/ / /// TBIU T6 / /// TBID T6 / /// Eau T6//// / Ventilateur T6//// // Blindage D T6 / //// Blindage G T6 / //// Palan pont/ / /// TDC2G TCSC 211708//// // TDC2G TCSC 220436//// //