TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint: https://espace.cern.ch/sba- workspace/tcc2wg/LS1%20worksite%20meeting/https://espace.cern.ch/sba- workspace/tcc2wg/LS1%20worksite%20meeting/
2
Statut Retrait MDLV Mise en place protection table plug-in TCSC Manutention et stockage chambre a vide Visite GS-CE à planifier en S51 Bilan des doses
3
MDLV
5
Protection TCSC
6
Liste des Impacts IntituleNumeroDose cumulee (uSv) Retrait TCSC37401 (closed)363 Suite et remontage TCSC38522209 Retrait 5 aimants374052369 Consolidation vide3740481 Survey EN-EL394500 Signalisation TDC2-TCC2391509 Total3031