Presentation is loading. Please wait.

Presentation is loading. Please wait.

Meeting of the Working Group on Rail Transport Statistics

Similar presentations


Presentation on theme: "Meeting of the Working Group on Rail Transport Statistics"— Presentation transcript:

1 Meeting of the Working Group on Rail Transport Statistics
Rail data availability overview & Dissemination of rail data Agenda point 3.1 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

2 Meeting of the Working Group on Rail Transport Statistics
Data Availability Data availability means received from the reporting countries Snapshot by mid-October 2013 Data available in the production database already imported in the dissemination database (Eurobase) 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

3 Deadlines for data transmissions
Deadline expressed in months after the end of the reference period Annex A tables: 5 months Annex B tables: 5 months Annex C tables: months for tables C1, C2, C5 14 months for tables C3, C4 Annex D tables: 8 months Annex E tables: 3 months Annex F tables: 12 months Annex G tables: 18 months Annex H tables: 5 months Annex I tables: 5 months 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

4 Freight Data Availability as of mid-October 2013
AVAILABLE OPTIONAL NOT APPLICABLE M MISSING TABLES 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

5 Passenger Data Availability as of mid-October 2013
AVAILABLE NOT APPLICABLE M MISSING TABLES C3-C4 2012: deadline for data provision not reached yet 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

6 Annex F - Regional Data Availability
As of end of September 2013 M MISSING TABLES AVAILABLE Q QUALITY ISSUES 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

7 Annex G – Traffic Flows Data Availability
As of end of September 2013 M MISSING TABLES AVAILABLE Q QUALITY ISSUES 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

8 Dissemination of the results in Eurobase
Annexes F&G data quality – 2010 data General quality satisfactory Recurrent issue in Annex G: a given segment flagged as both TEN and NOT TEN in different datasets Countries encouraged to implement consistency checks Dissemination of the results in Eurobase Annex G Annex F 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

9 Accidents Data Availability as of mid-October 2013
AVAILABLE M MISSING TABLES 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

10 Undertakings Data Availability as of mid-October 2013
AVAILABLE M MISSING TABLES 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

11 Data dissemination in Eurobase
Rail transport section regularly updated Data documented using Metadata (SDMX format) Country Specific Notes (CSNs) - regularly revised based on information provided by countries 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

12 Publications under preparation
“Statistics explained” articles Railway passenger transport statistics Railway accidents statistics “Statistics in Focus” to be available under Statistics explained article format Railway freight transport statistics 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

13 Meeting of the Working Group on Rail Transport Statistics
“Statistics explained” article 9-10 November 2011 Meeting of the Working Group on Rail Transport Statistics 6-7 November 2013

14 Thank you for your attention!
9-10 November 2011


Download ppt "Meeting of the Working Group on Rail Transport Statistics"

Similar presentations


Ads by Google