Download presentation
Presentation is loading. Please wait.
Published byCatinca Gheorghiu Modified over 5 years ago
1
Reaching Farther Wallops Flight Facility April 11, 2017
National Aeronautics and Space Administration Reaching Farther Wallops Flight Facility Bill Wrobel, Director April 11, 2017
2
Super Pressure Balloon
Awaiting launch in Wanaka, New Zealand Thus far, weather at ground and surface levels have prevented launch attempts
3
Operation IceBridge Team deployed to Thule Air Base, Greenland
First P-3 Operation IceBridge mission with new wings and tail Approximately 140 hours flown thus far in support of OIB
4
Sounding Rockets Upcoming Missions from Wallops
Completed successful Poker Flat campaign Four launches, three within a two hour period Studied Auroras and interactions of solar winds with Earth’s upper atmosphere Upcoming Missions from Wallops Subtec 7: May 2 Payload Ampule Testing Demonstration: May 23 RockOn: June 22 ASPIRE: August 1 RockSat-X: August 15
5
Upcoming Missions Antares will return to Wallops in late summer/early fall 2017 2 Antares missions on schedule for 2018 A Minotaur I (pictured right) has been scheduled to launch from Wallops in 2018
6
North Wallops Island Fire Station slated for completion in Summer 2017
New Facilities North Wallops Island Fire Station slated for completion in Summer 2017
7
New Facilities Mission Operations Command Center completion targeted for late Spring/Early summer 2017.
8
Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.