Workplan for the development of multi-risk analysis (WP7)
A. Garcia-Aristizabal
2
Objective “to develop a quantitative framework for multi-hazard and multi-risk analyses to assess risks associated with gas shale exploration and exploitation activities”
3
Objectives (specific)
To implement an effective mechanism to identify and structure scenarios of risk interactions and cascading effects, taking into account the phase of development of the project: Drilling Hydraulic stimulation Production Abandonment To develop and implement physically-based, probabilistic tools for the assessment of the likelihood of occurrence of interrelated risk scenarios considering: Induced seismicity Ground water pollution Air pollution NaTech-like accidents
4
Objectives (specific)
To implement the developed framework in one of the study case. To perform a comparative analysis between the impacts of shale gas operations and the impacts related to exploitation of alternative energy sources.
5
WP7 structure Task 7.1 Identification and structuring multi-risk scenarios (AMRA, KeU, KNMI) Task 7.2 Development of a probabilistic framework for the assessment of impacts associated with shale gas operations adopting a multi-risk perspective (AMRA, KNMI) Task 7.3 Comparative analysis of the impacts of shale gas operations with the impacts associated to conventional gas and oil sources (KNMI, AMRA, KeU)
6
Workplan for the development of multi-risk analysis
7
Framing the problem
8
Framing the problem
9
Framing the problem
10
Framing the problem
11
Primary risk receptors considered
12
Primary risk receivers considered
13
Primary risk receivers
Above surface Below surface
14
Framing the problem Risk receptors Atmosphere Local communities
Underground water Surface water ... Major hazard Multi-risk OUTCOMES Spills, Leaks Structural damages Blowout ... paths sources
15
Multi-risk analysis Main characteristics:
Scenario identification and structuring using event trees, fault trees and bow-tie analysis (for different phases). An approach based on key physical phenomena contributing to risk (precursor based?) Use of (simplified) Integrated Assessment Models Quantitative assessment based on Bayesian data analysis.
16
1. Scenario identification
Scenario identification and structuring using event trees, fault trees and bow-tie analysis.
17
2. Integrated assessment models
Use of (simplified) Integrated Assessment Models
18
Integrated assessment models
19
Bayesian approach Hierarchical Bayesian approach
20
Bayesian approach Hierarchical Bayesian approach
21
Bayesian approach Hierarchical Bayesian approach