1 Quantities and Price

2 What’s the most important when shopping?

3 Selling (buying) points
Price Size (amount) Quality

4 This also applies to Buildings & Construction

5 PRICE In order to CALCULATE THE PRICE of a building you need to know the quantities of: Building Materials Man Power Machinery / Equipment

6 3 WAYS to find a price Based on m2 price of building type
Based on m2 of building component Based on detailed calculations of Materials, Manpower, Machinery

7 Today you will use Based on m2 price of building type
Based on price for each m / m2 / m3 / pc of building components Based on detailed calculations of Materials, Manpower, Machinery

8 Your task: Find (measure) the quantities

9 What kind of building compnents do you have?

10 List of building components (examples):
Foundation Floor Outer wall (type 1, 2, 3, …) Internall wall (type 1, 2, 3,…) External door Internal door Window (type 1, 2, 3, ..) Roof Others

11 How to measure? Which units to apply? (m, m2, m3, pc (piece) )

12 FOUNDATION (m, m2, m3)

13 FLOOR ( m2 )

14 OUTER WALL ( m2 )

15 INTERNAL WALL ( m2 )

16 EXTERNAL DOOR (m2 or pc)

17 INTERNAL DOOR (m2 or pc)

18 WINDOW (m2 or pc)

19 ROOF ( m2 )

20 Applicable units SUMMARY:
Foundation (m, m2, m3) Floor (m2) Outer wall, type 1, 2, 3, … (m2) Internal wall, type 1, 2, 3,… (m2) External door (m2 or pc) Internal door (m2 or pc) Window, type 1, 2, 3, .. (m2 or pc) Roof (m2)

21 Look at the drawing Plan Section Elevation

22 Read or calculate the quantities Save all quantities on a spreadsheet

23 You will soon be ready for pricing!

24 GOOD LUCK !

25 YOUR JOB To estimate a price for: SOIL WORK CONCRETE BRICKWORK
CARPENTRY WORK AND TO FILL IN THE BIDDING LIST

26 BIDDING LIST ”Breakdown of the total BID into trades, building components or other units” Example

27 BID ”An offer to the client to complete a construction work for a certain amount of money”

28 YOUR JOB Calculate the price for:
Group 3.1, 3.2, 3.3, 3.4, CONCRETE Group 2.1, 2.2, 2.3, 2.4, BRICKWORK Group 1.1, 1.2, 1.3, 1.4, CARPENTRY SOIL WORK

29 2 PRICE LISTS UNIT PRICES PRICEBOOK PRELIMINARY

30 NOTE! THERE MAY BE PRICES MISSING ON THE AVAILABLE PRICELISTS.
IF SO…THEN ASK!

31 WHEN YOU HAVE COMPLETED THE BIDDING LIST FOR YOUR OWN TRADE, TRY TO CALCULATE OTHER TRADE-PRICES IN ORDER TO FULFILL THE COMPLETE BIDDING LIST!

32 GOOD LUCK !


Download ppt "Quantities and Price."

Similar presentations


Ads by Google