Download presentation
Presentation is loading. Please wait.
Published byEmerald Day Modified over 5 years ago
1
Connected System Exit Points Administration Options
DNOs Views (National Grid Distribution, Wales & West Utilities, Northern Gas Networks, Scotia Gas Networks)
2
Option 1 - The DCUSA Model
DNO invoices the aggregate transportation invoice to the iGT based upon load information provided to it by the iGT Subsequently, the iGT would levy an aggregate transportation invoice (in respect of both DNO/NTS and iGT services) per User (to a meter point level of detail) registered at the relevant CSEP Network
3
Option 1 - The DCUSA Model
(Or other governance)
4
Option 1 - Assumptions Obligations on lead/nesting iGT to procure/provide load data Replica of NTS reform model
5
Option 1 - Advantages Fewer counterparties for the DNO
Single transportation and energy invoice for the User Effectively places an obligation on iGTs to reconcile Meter Point data – targets resolution on appropriate party Consistent with NTS/DNO relationship Incorporates solution for nested arrangements (based on the relevant ‘assumption’) Lends itself to harmonisation of governance (one UNC) Incentive is appropriately placed on iGTs not to bear DNO costs if the iGT invoices User erroneously
6
Option 1 – Disadvantages
Reliance on information provision by iGTs who have no commercial interest in providing the data Potentially not effective unless the offtake is metered (option 1A) As the iGT would effectively be charged as a User (Shipper) of the NTS/DN networks this is likely to require exemption from Gas Act section 7(3) and section 7A(3) Likely to require new Transporter licence obligation Credit arrangements required between NTS/DNO and iGT Lack of clarity for the requirements in respect of nested arrangements Risk of understatement of demand (metering of some offtakes may be required)
7
Option 2 - Individual Meter Point Detail
load information (including Larger Supply Point (LSP) reconciliation volumes) will be issued by iGTs to DNOs at a meter point level of detail. Any changes in respect of load or Registered User (transfers) will be required to be issued to DNOs on daily basis ‘de-coupling’ of the physical and commercial processes such that the registration of the first Supply Point/s at a CSEP will not require the DNO authorisation of the engineering aspects of the CSEP connection nested iGTs would be required to issue appropriate meter point information directly to xoserve along with meter point reconciliation volumes for LSPs
8
Option 2 - Individual Meter Point Detail
9
Option 2 - Advantages Enables Users to identify meter point mismatches between NTS/DNO and iGT invoices Highlights the major cause of the current Supply Point mis-match Provides method of capturing nested load Augments SCOGES services Appropriate parties retain control over their invoicing Not significant regime change
10
Option 2 – Disadvantages
Continued requirement for information provision by iGTs for whom there is no benefit in the provision the data Requires DNOs to establish an alternative method of addressing engineering validation and potential load breaches as these will no longer frustrate the commercial processes Requires significant system change and also the management of a greater quantity of data items New iGT-DNO file formats required Does not resolve the issue
11
Option 3 - Industry Data Manager
The DNOs’ service provider (DSP) would build and maintain a Supply Points Register on behalf of iGTs to support both the DNO invoicing of Users and the iGTs UNC obligation to maintain a Supply Point Register Users would perform their SPA transactions directly with the DSP and consequently iGTs would take information from this register (either via direct access or periodic data feed?) to facilitate its own invoicing The DSP would potentially utilise a clone of the existing Sites and Meters database and therefore file format requirements are likely to be in line with those in use for directly connected Supply Points
12
Option 3 - Industry Data Manager
User 1 iGT DSP User 2 SPA Transactions SPA Data feed iGT Transportation Charges DNO Transportation Charges
13
Option 3 - Assumptions All iGTs utilise common service provider (the DSP) pursuant to a licence obligation Beneficiaries required to contribute Data cleansing exercise required for implementation Appropriate governance and funding in place
14
Option 3 - Advantages Removes the majority of the reliance on data provision by iGTs DNO agent maintains control of data necessary to levy NTS/DNO invoice Single dataset utilised to levy NTS/DNO and iGT invoices Single communication protocol for User – Transporter communications Allows the streamlining of demand allocation and settlement processes operated by the DNOs agent Provides a greater level of confidence to DNOs that costs are being apportioned accurately in line with UNC and licence Proven model already exist (Sites and Meters) – a clone system is likely to deliver the solution Reduce SCOGES costs for iGTs Moves to a ‘real-time’ position Estimated £2million annual cost saving for top six Users
15
Option 3 – Disadvantages
Requires major regime reform – new contractual terms (and potentially licence obligations?) would be required Requires the management of a greater quantity of iGT related data by DSP. (c.1million additional Supply Points) Requires consideration of set up and ongoing funding issues
16
Option 4 - Enhance Current Regime (interim solution?)
maintain the current regime and make incremental improvements such as ‘de-coupling’ of the physical and commercial processes such that the registration of the first Supply Point/s at a CSEP will not require the DNO authorisation of the engineering aspects of the CSEP connection
17
Option 4 - Enhance Current Regime (interim solution?)
xoserve SPA Aggregate Data DN/iDN Invoice (NTS/DN/iDN Network) Reconciliation Volume Uniform Network Code NExA Shipper iGT iGT Network Code SPA Activity Meter Readings Invoice (iGT Network)
18
Option 4 - Advantages Offers ‘solutions’ that can potentially be delivered in the short term Maintains the current LMN level of detail held by xoserve
19
Option 4 – Disadvantages
Requires DNOs to establish an alternative method of addressing engineering validation and potential load breaches as these will no longer frustrate the commercial processes Does not enable Users to directly identify meter point discrepancies Continued requirement for information provision by iGTs for whom there is no benefit in the provision the data Requires potential system and validation changes for xoserve / DNO processes
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.