Presentation is loading. Please wait.

Presentation is loading. Please wait.

Team T3 (#3) Tom Lastoskie Lead.

Similar presentations


Presentation on theme: "Team T3 (#3) Tom Lastoskie Lead."— Presentation transcript:

1 Team T3 (#3) Tom Lastoskie Lead

2 Team Members Tom Lastoskie – AFIT Gary Stanley – Ctr AFRL
Ian McCammon – L3 Tech. Brenda Wesp – Lockheed Martin Jason Schmidt – Boeing Andy Davis – Army CERDEC Kevin Brower – Army CERDEC Robert Arthur – DAU Chad Lavos – BAE Systems Ryan Halsey – BAE Systems Mike Deitchman – Ctr, ONR Thomas Fiorino – APT Corp.

3 Feedback on Recommended Manufacturing & Quality Assurance RFP Inputs
Team Assessment of Recommended RFP Inputs Is this item value added: Yes! Suggested changes: Para 1.2 – all AQMS, instead of just AS9100 © Pg 2 – FAI; Check in O & S box © Pg 2 – 3 lines indented 1 space (A) Pg 2 – Mfg Modeling and Simulation: Check in TMRR box © Pg 2 – Define what the ckeckmarks mean e.g., “recommended Best Practice” Pg 3 – remove PRR and use “all major technical reviews” Pg 3 – remove “Society of…” Pg 3, Para 1.2 – first “and” to “and/or”

4 Feedback on Recommended Manufacturing & Quality Assurance RFP Inputs
Team Assessment of Recommended RFP Inputs Is this item value added: Yes! Suggested changes: Pg 4 – “implement mfg maturation plans” needs to be updated in Deskbook language and match to this effort Pg 4, para 1.3 – Add “The prime contractor shall host a government Mfg Readiness Level Assessment.” Pg 4 – Throughout document remove “Tailored” in box to “X” (A) Pg 4 – para 1.3 – status of “mitigation plans’ to “manufacturing readiness” Pg 5 – Remove “As a minimum,” Metrics may include, but are not limited to, ….” Pg 5 – spell out MRB Pg 5 – remove submit “monthly” Pg 5, Para 1.4 – remove last sentence Pg 5, Suggested DID, remove require “on-line” access

5 Feedback on Recommended Manufacturing & Quality Assurance RFP Inputs
Team Assessment of Recommended RFP Inputs Is this item value added: Yes! Suggested changes: Pg 6 – to “the contractor’s suppliers” General – use the term “suppliers” throughout Pg 6 – last sentence shall “make available” Pg 6 – delete semicolon “AS5553, Coun… Parts,” Pg 6 – use “embedded” We need to add a paragraph about FAT (6.5.7 in AS6500) Pg 7 – block for O & S “X”’d Pg 7, Para 1.7 – remove two periods

6 Feedback on Recommended Manufacturing & Quality Assurance RFP Inputs
Team Assessment of Recommended RFP Inputs Is this item value added: Yes! Confirm Suggested changes: Pg 8, Para 1.8 – Remove second sentence Pg 8 – remove “A follow-on ….” Pg 9 – consider adding AS9103 as a new paragraph under 2.0 Pg 9 – first sentence constraints “and” confirm … Pg 9, para 2.2 – new para “M&S in accordance with AS Shall statement for report General: Instead of restating items already addressed by AS6500. Paragraph(s) only call out reports (for DID purposes).

7 Workshop Feedback Questions to Answer 1
Working: Seeing traction is use of MRLs Cultural change is happening MRL website is great Not working: More user friendly place to learn about the MRL process

8 Workshop Feedback Questions to Answer 2
MRL process better: MRL education (market segment analysis) Availability for practitioners Availability for PMs, etc Availability for process owners MRL process more efficient: Users Guide updated to reflect MRL Deskbook

9 Workshop Feedback Questions to Answer 3
MRL WG 2019 efforts: How do we engage executives on importance of MRLs How do people get good training/education Develop list of candidates for Quality and Manufacturing metrics by Product Life Cycle Phase

10 Overall Feedback on Workshop
Team Assessment of workshop (comments/suggestions) Valuable Networking within/outside DoD Discussions between industry/DoD Try to get more variety with industry participation Remember - this process is for all US industry Editing of ideas at workshop is valuable Synopsis of attendees provided before Workshop

11 Summary


Download ppt "Team T3 (#3) Tom Lastoskie Lead."

Similar presentations


Ads by Google