1 HMA-FO Task 1 Status Frédéric Houbie, ERDAS Steven Smolders, GIM
Andrew Woolf, Dominic Lowe, STFC

2 Task 1 Structure WP1000 – Project Management (ERDAS)
WP2000 – Analysis of the extension and Update of the EO GML Task 2100 – ERDAS contribution: document update and OGC submission process Task 2200 – GIM contribution: synthesis and systematic products Task 2300 – STFC contribution: radar altimeter, limb looking products, new schemas WP 3000 – Test Task 3100 – SSE (GIM) Task 3200 – CITE (ERDAS) WP 4000 – OGC process (ERDAS) Slide 2

3 Task 1 Planning We are here Slide 3

4 WP 1000 WP 1000: Project management Progress reports uploaded Slide 4

5 WP 2000 WP 2000: Analysis of the extension and update of the EO GML
WP2100: Catalog TN No new update WP2200: Synthesis and systematic products Comparison of code lists for variable names Liaison between Task 1 and Task 3 on handling of metadata Finalisation of metadata TN and schema extensions Compilation of questionnaire WP 2300 : Radar altimeter, limb looking products, new schemas Finalising of Altimetry and Limb-looking metadata proposal, including further feedback, with revision of TN as appropriate. Metadata harmonisation with GIM and Systematic/Synthesis products. UML changes to reflect updated metadata. Preparation of Questionnaire. Collaborated with Simon Cox to ensure O&M XML satisfies HMA-FO requirements  Slide 5

6 WP 3000 WP3000 Tests Training at IGN next week to use their framework
Slide 6

7 WP4000 WP4000 OGC Process CS-W ebRIM SWG
Waiting for Carl for the announcement Portal ready, Meeting at the next TC to discuss and validate all the CR Charter members are : ERDAS GALDOS CNES IGN NGA Cubewerx Slide 7

8 Questionnaire Questionnaire Ready later than expected
Comments from DLR at the very last moment Objective is to receive feedback by 3 weeks (mid May) Slide 8

9 Action MOM25 a19 - Documents to be aligned with ECSS-E-ST-40C Closed
Not relevant for technical notes or OGC standards Closed Slide 9

10 Action MOM27 Raise/support CR to have full Filter Syntax not mandatory. Discussed during last CS-W telecon when dealing with FE 2.0 support Leave it open until concrete CR is written Slide 10

11 Action MOM28 Change term "ad hoc query" into more appropriate term.
Open : To be discussed in the CS-W ebRIM AP 2.0 Slide 11

12 Actions MOM 33,34,35 Use O&M "metadata field" as per MoM.
Use O&M "Observed Property" as per MoM. Use O&M "resultTime" as per MoM. Implemented in the TN Closed Slide 12

13 Action MOM41 analyse Spotimage EO metadata requirements TN and impact on EO GML EO Products Element analyzed Administrative MD (ISO 19115) mapped to metadata property of O&M is used Left as open as some points might still be discussed after the questionnaire feedback. Slide 13

14 Actions JM01  JM05 Addressed in last update of the TNs Closed
Slide 14