ArcWorks Process Improvement P08008
Project Lead: Eric Meinecke (ISE) SD1 start: Winter SD2 start: Spring Thursday, February 21, 2019
2
Project Review Objective: Develop a method by which the bottle top assembly can be assembled faster and with less ergonomic stress on the user. Also analyze and correct any supply chain issues. Primary/ Secondary Stakeholders: Arc Works of Monroe County, Nelge Nunc, ISE department, ME department, senior design team Staffing Requirements: 3-4 MEs & 1-2 ISEs Past senior design teams: P07008 and P06208 Budget: $1,500 Thursday, February 21, 2019
3
Update on task being looked at
Prior information assumed assembly shown below Actually task is automated the task below with multiple assemblies being performed simultaneously. Thursday, February 21, 2019
4
Three Week SD1 Plan Thursday, February 21, 2019
5
Team Values and Norms Current values and norms on EDGE template
Fit most of all needs for this project Additional Values/Norms AWARENESS This project requires team members to be conscientious about who they are working for The workers have various disabilities and the high respect must be shown, as well as maturity. A lack of maturity will not be tolerated. Thursday, February 21, 2019
6
Grading For SD1 and SD2 Thursday, February 21, 2019
7
Required Resources Thursday, February 21, 2019
8
Identify Customer Needs
7.1.a 7.1.b 7.1.c Thursday, February 21, 2019
9
Identify Target Specifications
Comply to OSHA Specifications Time to failure of tool Number of defects created Operator touching parts during assembly Number of top sizes accepted Setup time for different size tops Force required to perform task Takt time Can visually tell stage of production of any part Provide Process instructions for product Can count number of assemblies Yes/No # Parts till failure # defects Yes/ No # of tops accepted Seconds Newton's Thursday, February 21, 2019
10
Risk and Concerns Pneumatics will need to be learned by ME, or an ME with prior experience must be found Was told that pneumatics is not taught in classroom Addressing the needs of each disability Being able to replicate disabilities when testing the tool in SD2. Thursday, February 21, 2019
11
Outstanding Items Confirm availability of space in Ergonomics lab, TPS Lab, and also possible SD floor space Review needs hierarchy with Dr. Marshall, and then John Syrkin Schedule appointment for SD team to have a walk through at ArcWorks during first week of SD1. Thursday, February 21, 2019