Building for Learning Project Photo Progress Report 4 November 2009 – December 2009 Project commencement 21 st September 2009
2
AWCC Chairperson Kerryn Dwyer-Parish with Graeme Connelly undertaking site inspections Kerryn braved the situation – high heels and all
3
The 65mm of rain made for 4 internal swimming pools but the task is completed
4
And no photographic record is complete without some rabbit ears
5
November Internal Refurbishments continue
6
Internal Refurbishments Administration Area
7
New ceilings, plaster, office and painting
8
Key workers without who the job could not be done.
9
December new on-site substation for power required.
10
December – carpet, ceilings and windows in modernised Administration area
11
December – steel, bond deck arrives for 1 st Floor
12
December – underground cable boring and concrete footings for stairways and elevator
13
December – Company Directors tour with Graeme Connelly – girls were happy, boys were serious. L-R. Chairperson Kerryn Dwyer-Parish, Director Jan Wyatt-Brown, Director Alison Mitchell, Corporate Services Manager Pauline Butler, Builder Graeme Connelly, Director Rod Jones, Director David Ryan.
14
December – bracing underneath bond deck and steel ready for concrete floor above
15
Final preparations and then concrete pour starting 6am, 22 nd December – 150 tonne concrete
16
22 nd December – 11 truck loads of concrete