Ceiling Frame is the structure between the top of walls and the roof
Enclose the Room Frame Consists of Ceiling Joists, Ceiling Trimmers, Hangers, Hanging Beams Used in Skillion, Gable, Hip Roof
6
Ceiling Joists Horizontal Members with ends rested on top wall plate
Generally spaced at 450mm or 600mm Initially ceiling material will determine spacing Sizes and Grading are determined from Span Tables Ceiling Lining may be nailed directly to Joists
7
Ceiling Joists Provide Lateral Tie between opposing Rafters
Portal Frame Design Walls Require Alternate Bracing Butressing Typical Residential Design (Coupled Roof)
8
Definition – Coupled Roof
9
Non Coupled Roof
10
Installation of Ceiling Joists
Tops of Ceiling Joist may be trimmed so as not to protrude
11
AS Ceiling Joists Ceiling Joists shall be spaced to support ceiling linings For Coupled Roofs Ceiling Joists run in same direction as rafters Be in single lengths or spliced Same spacing as Rafters
12
Ceilings Provide Diaphragm Bracing
13
Ceiling are an Important Structure
Support For Ceiling Linings Tie bases of Rafters (Stop Spreading) Straighten Walls (Between Intersecting Walls) Diaphragm Bracing (9000mm Max)
14
Joining Ceiling Joists
Be only made at points of support Lapped over support 3 times depth - 6 hand driven nails 75mm x machine driven nails 75mm x or 1 M12 Bolt Butt joined - fish plates to each side - minimum 6 x depth of joist - 19mm x Depth of Ceiling Joist Nailing plates as per manufacturers detail
15
Excercise Complete Question 6
16
Selecting Members 10mm Plasterboard Direct Fix Single Span
Ceiling Joist A x = 2000mm 450 c to c What size Ceiling Joist is Required ?
17
Remember First Check the NOTES! From Appendix B
Refer p99 AS1684.2 Remember First Check the NOTES! From Appendix B 10mm Plaster Board = 7.5kg/sqm Therefore OK Check Grade ! What are Ceiling Masses ? Refer Appendix B – AS 450 Centres Next Highest Span above Required 2000mm Span
18
Selecting Members Single Span Ceiling Joist A x = 2000mm
450 c to c 120mm x 35mm Single Span Ceiling Joist B x = 2700mm 450 c to c. What Size Ceiling Joists are required?
19
Next Largest span after 2700mm
Check for Required Grade ! 450 c to c
20
Selecting Members Continuous Spans 10mm Plasterboard Direct Fix
Single Span Ceiling Joist B x = 2500mm 450 c to c 120mm x 45mm Ceiling Joist A & B – AS 1684 requires joists to be Continuous x + y = 4500mm 450 c to c Note – Maximum Span is 2700mm, 4700mm is irrelevant
21
Next Largest span after 2700mm
450 c to c Continuous Span Check For Required Grade !
22
Compare Single to Continuous
120 x 45 F7 120 x 35 F5 10mm Plasterboard Direct Fix Ceiling Joist A & B as Continuous Joist 450 c to c, 10mm Plasterboard 120 x 35 F5 is Sufficient
23
Exercise Complete Question 5 on Workbook 120 x 35 140 x 35 3500
Using MGP 10 select suitable Ceiling Joints Joist X = Joist Y = Using MGP 10 select suitable Ceiling Joints for continuous span Max Span Required Ceiling Joist size = 120 x 35 140 x 35 3500 120 x 35
24
Why Continuous Spans
25
Continuous Span
26
Framing Openings in Ceilings
AS cl Openings up to 1000mm – same size as ceiling 1000mm up to 3000mm – width increased by 20% for every 300mm of opening
27
Ceiling Openings Example
Ceiling Joists 90 x 45 MGP 10 Radiata Pine 1800 Square Opening 1800 – = 800 (1000mm being maximum allowable to use same members) 800mm divided by 300mm = therefore 3 increments 45mm x 1.2 = 54mm 1st Increase by 20% 54mm x 1.2 = 65mm 2nd Increase by 20% 65mm x 1.2 = 78mm 3rd Increase by 20% Therefore minimum size is 90mm x 78mm
28
Excercise Complete Questions 4 & 5 in the Worksheet
31
What items determine the sizing of Ceiling Joists?
Refer to Span Tables Complete Questions 7 & 7.1 of Workbook
32
Hanging Beams- also referred to as Hangers
Hanging Beams provide support to Ceiling Joists where walls are available
33
Connecting Hanging Beams to Ceiling Joists
Ceiling Dog
34
Connecting Hanging Beams to Ceiling Joists
Unitie 4 Timber Connector Nails in Each Member
35
Connecting Hanging Beams to Ceiling Joists
Triple Grips 35mm x 3.15 Connector Nails in to each member
36
End Support of Hanging Beams
Hanging Beams shall nailed or bolted to a rafter Beam Shall Bear Full Width of Plate on Packing Where more than 2/3 of the Beam needs to be trimmed a ceiling trimmer is required
37
Isometric View Complete Exercise 8 of the Work Book
38
Restraining Deep Hanging Beams
What is a Deep Beam ? Where depth is Greater than 7 times the Width
39
Hanging Beams Gable Ends
Packing Full Width of Plate. Build up to top of Ceiling Joists Where Beam is longer than 3000mm stud required directly below Where this occurs at Gable Ends , no ceiling joists to brace end wall The Beam will also act as a “Binder”
40
Binders refer AS cl At Gable Ends walls do not have Ceiling Joists to Brace them
41
Work Book Complete Question 9
42
Selecting Member Sizes Hanging Beam Refer Question 10
Ceiling Joist Span = 3600mm Hanging Span = 4500mm
43
What is Ceiling Load Width ?
Check Notes
44
Without Hanging Beam all Load is transferred to walls
Hanging Beam is similar to having a wall in same location
45
Required Beam 190 x 45 MGP 10 What is Ceiling Load Width ? 1800mm What is the Hanging Beam Span ? 4500mm
46
Complete Workbook Q10
47
Counter Beams called Hanging Beams in the TAFE GUIDE
Reduce Span of Hanging Beam At 90º to Hanging Beams Supported on Walls With stud directly below if longer than 3000mm Trimmed for Roof Finishes Similar to Hanging Beams
48
Intersection of Hanging & Counter
Note – Counter Beam is Supporting Hanging Beam
49
Intersection of Hanging & Counter
50
Intersection of Hanging & Counter
Hanging Beam Counter Beam Packer to Provide Clearance to Ceiling Complete Q11 & 11.1 in Workbook
51
Counter Beams Reduces Span of Hanging Beam
Without Counter Beam, Hanging Span is x Load Flow x/2 Once Counter Beam is installed, Hanging Beam Span is now x/2 x/2 Load Flow
52
Selecting Member Counter Beam Span = 3600mm
Hanging Beam Length (x) = 6000mm
53
Counter Beam Spacing = x/2
There may be more than 1 X= 8000mm Beam Span 4000mm Check Grade Check Notes
54
Determine Suitable Counter Beam
Complete Questions 11 & 12 F8 MGP 12 F14 F27 190 x 45 170 x 35 175 x 40 140 x 45 or 2/120 x 35 Counter beam span 3600 Hanging Beam Length (x) 6000
56
Combined Strutting/Hanging Beams
Reduce Span of Ceiling Joists and Purlin Supported on Walls With stud directly below if longer than 3000mm Roof Load Strutted down to Hanging Beam
57
Check Grade First we need to determine what ceiling load it carrying? Roof Masses Check Notes
58
Ceiling Load Width (CLW)
Sheet Roof Ceiling Joist Span (x) = 4200 Hanging Beam Span = 6000 Rafter Span (B) = 4500 Therefore CLW = 2100 Remember what we are trying Work out is what load is the member carrying
59
Next we need to calculate what roof load it is carrying?
60
Roof Area Support Sheet Roof Why A ?
Strut Down to Beam from Purlin(Roof) Struts down to top plate distance between these 2 struts is A Therefore strut takes load ½ way between other supports 5000/2 = A A = 2500 Ceiling Joist Span (x) = 4200 Hanging Beam Span (A) = 5000 Rafter Span (B) = 4500
61
Roof Area Support Why B? Rafter is supported by Purlin
Rafter Load is Transferred thru Purlin Strut Ridge Strut, Top Plate Therefore Beam takes load ½ way between supports (4500/2) = 2250 Ceiling Joist Span (x) = 4200 Hanging Beam Span (A) = 5000 Rafter Span (B) = 4500
62
Remember Ceiling Load Width = 2100
Next we need to calculate what roof load it is carrying? 2.250 (Rafter Span) x 2.500 ( HB Span) =5.625 Required Hanging Beam Span = 5000 Required Hanging Beam Span = 5000mm
63
Combined Strutting/Counter Beams
Reduce Span of Hanging Beam Supported on Walls With stud directly below if longer than 3000mm Roof Load Strutted down to Hanging Beam
65
Strutting Beam No Ceiling Support Load Flow
66
Complete Q13
67
Alternate Ceilings P288 Flat Roof Construction
69
Exposed Grid Ceilings Page 289
70
Exposed Grid Ceiling
72
Concealed Fixed Suspended Ceiling Page 290
73
Direct Fix Systems Page 290
74
Estimating Determine No of Ceiling Joists 12 250/ 600 = 20.4167
12 250/ 600 = = =
75
Place Hanging & Counter Beams
Single Span greater than 200mm
78
Ceiling Trimmers 6650 ÷ 600 = 11.083 = 12 + 1 to Close = 13
800 ÷ 600 = 1.3 = 2 + 1 to Close = 3 = 23 39 x = = 21.6 Say 6.0 = 18.0 3.6 = 3.6 6650 ÷ 600 = = 12 + 1 to Close = 13x2 = 26 3350 ÷ 600 = 5.6 = 6 + 1 to Close = 7
80
Determine Hanging Beams
5450 2850 3850 3300 4400
82
Counter Beam
84
Ceiling Dogs Every Time a joist crosses a beam One at every Hanging Beam Two at Ceiling Joist Joints
86
Planning
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.