Download presentation
Presentation is loading. Please wait.
Published byWilfred Simon Modified over 5 years ago
1
Sheung Li Task Group J Chairperson March 14, 2003
Task Group J Report Sheung Li Task Group J Chairperson March 14, 2003 Sheung Li, Atheros
2
March 2003 Actions by TGj Reviewed technical presentations addressing GHz Japan Issues Reviewed and modified draft 1.0 of TGj text Motion to approve draft 1.0 28 affirmative, 0 negative, 0 abstain Motion for WG to issue letter ballot on P802_11j-D1.0 26 affirmative, 0 negative, 0 abstain Motion to empower TGj at May meeting 25 affirmative, 0 negative, 0 abstain Sheung Li, Atheros
3
TGj Working Issues Channel numbering Channel widths
March 2003 TGj Working Issues Channel numbering Channel widths PHY timing for different applications and channelizations Sheung Li, Atheros
4
March 2003 Objectives for May 2003 Review results of letter ballot if one has been issued Resolve comments if any and update draft text as necessary Further Technical Presentations Issue a WG Letter Ballot or Recirculation Ballot as necessary Sheung Li, Atheros
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.