Presentation is loading. Please wait.

Presentation is loading. Please wait.

LAMAS Working Group December 2013

Similar presentations


Presentation on theme: "LAMAS Working Group December 2013"— Presentation transcript:

1 LAMAS Working Group 12-13 December 2013
Agenda Item 2.4 Modularisation and sub-sampling

2 Why sub-sampling? Not all output needs quarterly frequency
Computer assisted data collection makes it technically possible Could reduce costs for data collection Enables shorter questionnaires per interview To accommodate CAWI data collection

3 Modularity as framework for sub-sampling
Modules as building blocks (rather than variables) Defined by target group, contents, frequency and precision of measurement Linked to questionnaire Per module assign: Frequency (sub-)sample

4 Sub-sampling is a design option
Sub-sampling (in a modular context) allows countries to design their LFS Taking into account national requirements and circumstances … While meeting EU requirements … And respecting a few design rules Applying sub-sampling is not compulsory

5 Design rules for sub-sampling
Two sets of annual modules: BACKGR & JOBDET Corresponding sub-samples are defined by waves Freedom to assign sub-samples to waves as long as BACKGR wave<=JOBDET wave Sub-sampling of households using BACKGR

6 AHMs/SAMs assigned to sub-samples
BACKGR general background AHMs: Migrants (2014), Reconciliation of work and family life (2010) Household as observation unit JOBDET job details AHMs: Work organisation (2015), young people on the labour market (2016) Individual as primary observation unit AHM in 2nd quarter is not allowed anymore

7 Rotational scheme LFS with 5 waves

8 Two sub-samples with 5 waves

9 Possible design variants (1)

10 Possible design variants (2)

11 Possible design variants (3)

12 Possible design variants (4)

13 Possible design variants (5)

14 No sub-sampling

15 Sub-sampling of annual modules

16 Sub-sampling of households

17 The LAMAS working group is asked to
agree on the proposal for a modular EU LFS with 2 blocks of (multi-)annual modules identify issues that need further development

18 Thank you for your attention!

19 Possible design variants (6)


Download ppt "LAMAS Working Group December 2013"

Similar presentations


Ads by Google