1 ART OF PREPARATION AND PRESENTATION OF PROJECT FEASIBILITY REPORTS

2 PROJECT FEASIBILITY REPORT
GENERALLY A TECHNO COMMERCIAL DOCUMENT IN A STANDARD FORMAT A LARGE & VARIED COVERAGE LOT OF SUPPORT DATA & DOCUMENTS ALL FUNCTIONAL AREAS OF BUSINESS VENTURES

3 MAJOR ITEMS COVERED IN A REPORT
PRODUCT DESCRIPTION, SPECIFICATION, RANGE, ENDUSE DOMESTIC AND EXPORT MARKET PROSPECTS PROPOSED MARKETING ARRANGEMENTS

4 PROMOTERS & MANAGEMENT
TECHNICAL ASPECTS – PROCESS, EQUIPMENT, QUALITY, MATERIALS, UTILITIES, INFRASTRUCTURE & MANPOWER PRODUCTION CAPACITY, PRODUCT MIX & OPERATIONAL PARAMETERS

5 PROJECT COST ESTIMATION
SOURCES OF FINANCE FUTURE FINANCIAL PERFORMANCE FINANCIAL INDICATORS – IRR, BEP & DSCR SENSITIVITY ANALYSIS

6 PROJECT REPORT PREPARATION
ACCOUNTANT’S APPRAOCH MAINLY FINANCIAL AND ECONOMICS ORIENTED HIGHLY ANALYTICAL IN NATURE TECHNIQUES ORIENTED BASED ON PARAMETERS

7 CONSULTANT’S APPROACH
INDEPENDENT DATA COLLECTION AND EVALUATION OF MARKET PROSPECTS DETAILED EVALUATION OF TECHNICAL ASPECTS APPRAISAL ON PROMOTERS & MANAGEMENT CAPABILITIES TECHNO COMMERCIAL APPROACH IN STANDARD PATTERN

8 ‘ART’ COMES INTO PICTURE, WHEN THE REPORT IS PREPARED & PRESENTED WITH SPECIFIC EMPHASIS ON
PURPOSE END USER NATURE OF SCHEME THIS IS IMPORTANT TO ACHIEVE END RESULTS TO SAVE TIME & EFFORTS

9 PURPOSE END USE MAY BE PRELIMINARY PRE FEASIBILITY STUDY FOR
MANAGEMENT COMPARISON OF TWO OR MORE PROJECTS PRELIMINARY CLEARANCE FROM AGENCIES (FIPB/POLLUTION CONTROL BOARD/SIA)

10 DETAILED FUND MOBILISATION BY MANAGEMENT TO FINALISE TECHNOLOGY TIE-UP ARRANGEMENTS APPOINTMENT OF DETAILED ENGINEERING CONSULTANTS TO FINALISE MARKET TIE-UP ARRANGEMENTS

11 END USER USERS MAY BE TOP MANAGEMENT FIs / BANKS GOVERNMENT AGENCIES
SHARE HOLDERS/MF/INVESTING PUBLIC PROJECT IMPLEMENTATION AGENCIES

12 NATURE OF SCHEME NEW PROJECT BY A NEW PROMOTER/COMPANY
NEW PROJECT (DIVERSIFICATION) FOR AN EXISTING COMPANY MODERNISATION-CUM-EXPANSION PROJECT EXPANSION PROJECT

13 PROJECT REPORT FOR TOP MANAGEMENT
EMPHASIS TO BE ON SPECIAL FEATURES OF THE PRODUCT CRITICAL INPUT FACTORS (RM, POWER, ETC.) CONTRIBUTION ANALYSIS WITH EXISTING PRODUCTS/THOSE OF OTHER COMPANIES KNOWHOW AVAILABILITY & ITS RELIABILITY

14 INTERDIVISION BENEFITS & TRANSFER PRICING
EXPECTED MARKET SUCCESS FACTORS PROJECT SIZE & PROMOTER’S CONTRIBUTION SCOPE FOR ENHANCING CAPACITY LEVEL OF AUTOMATION & MANPOWER NEEDS

15 INNOVATIVE SOURCES OF FINANCE (SHARE PREMIUM / SUBSIDY / GRANT / DEFERRALS)
PROFITABILITY INDICATORS - IRR ON PROJECT - IRR ON EQUITY - BEP - PAYBACK PERIOD RISK FACTORS AND SENSITIVITY ANALYSIS

16 PROJECT REPORT FOR FI/BANKS
(TO AVAIL TERM LOAN/WORKING CAPITAL LOAN) EMPHASIS TO BE ON SPECIAL FEATURES OF THE PROJECT (PROCESS, PROJECT COST/MT, INNOVATIVE PRODUCT, TECHNICAL/ FINANCIAL TIE UP ETC.) PROMOTERS – BACKGROUND, SUCCESS IN PROJECTS, FINANCIAL SOUNDNESS, ETC.

17 MARKETING ARRANGEMENTS – BUYBACK FORMULA (IF ANY)
PRESENT STATUS – (LAND ALLOTTED, PROJECT TEAM, KNOWHOW TIE-UP ETC.) REASONABLENESS OF TECHNICAL KNOWHOW FEES - BASIS STRENGTHS & SUCCESS FACTORS DEBT EQUITY RATIO (FOR PROJECT & COMPANY AS A WHOLE)

18 PROMOTERS’ CONTRIBUTION – SOURCES
PROFITABILITY INDICATORS – DSCR, IRR, BEP PROFITABILITY RATIOS (INDUSTRY COMPARISONS) CRITICAL FACTORS & SENSITIVITY ANALYSIS ADDITIONAL/COLLATERAL SECURITY OFFERED FOR TL/WC LOANS

19 PROJECT REPORT FOR GOVERNMENT AGENCIES
EMPLOYMENT POTENTIAL SUPPORT TO SMALL BUSINESSES/SUBCONTRACTORS CONTRIBUTION TO GOVT. REVENUES (EXCISE DUTY, ST, ETC.)

20 AREA DEVELOPMENT (SUGAR, CEMENT, ETC.)
EXPORT POTENTIAL/IMPORT SUBSTITUTION POLLUTION CONTROL MEASURES ECONOMIC BENEFITS OUT OF THE PROJECT

21 PROJECT REPORT FOR SHAREHOLDERS/INVESTING PUBLIC/MF
EMPHASIS ON PROFITS/INCREMENTAL PROFITS RETURN ON EQUITY DIVIDEND PROSPECTS

22 TAX BENEFITS TO SHAREHOLDERS/COMPANY
GROWTH POTENTIAL IN THE PRODUCT LINE PRESENT STATUS OF THE PROJECT BUSINESS RISKS

23 PROJECT REPORTS FOR IMPLEMENTATION AGENCIES
(DETAILED ENGG. FIRMS, ERECTION ENGINEERS, ETC.) EMPHASIS ON PROJECT LOCATION & FACTORY SITE SITE CONDITIONS – SOIL TEST/WATER TEST TECHNICAL SPECIFICATION FOR BUILDINGS & CIVIL WORKS

24 PLANT & MACHINERY –SPECIFICATIONS, MAKE, MODELS, IMPORTED/INDIGENOUS, LOCAL FABRICATION NEEDS
SUBCONTRACT FACILITIES AVAILABILITY UTILITIES & INFRASTRUCTURE PROJECT IMPLEMENTATION SCHEDULE – STAGES FOR FUND ARRANGEMENTS/LOAN DRAWALS SPECIFIC GOVERNMENT CLEARANCES/APPROVALS

25 PROJECT REPORTS FOR MODERNISATION CUM EXPANSION
EMPHASIS TO BE ON COMPARISON OF EXISTING PARAMETERS WITH NEW PARAMETERS PLANT CAPACITY PLANT PRODUCTIVITY LEVELS INPUT/OUTPUT RATIO

26 LINE REJECTION LEVELS UTILITIES CONSUMED LEVEL OF AUTOMOTION MANPOWER INCREASE IN PRODUCT RANGE

27 SHOP ENVIRONMENT REDUCTION IN POLLUTION SAFETY NORMS REPAIRS & MAINTENANCE EXPENSES PLANT DOWNTIME SET UP TIME

28 TO HIGHLIGHT INCREASE IN INTEREST & DEPRECIATION COST SAVINGS IN COST COST BENEFIT ANALYSS IMPROVEMENT IN PRODUCT QUALITY/RANGE & MARKET SCOPE PROMOTER’S CONTRIBUTION

29 ART OF PRESENTATION PRESENTATION TO BE IN TERMS OF
CONTENT – TABLES, CHARTS, GRAPHS & SOURCES OF DATA SIZE HIGHLIGHTS CRITICAL AREAS SELECTIVE INCLUSIONS STAGEWISE PRESENTATION

30 GENERAL PRESENTATION FOR FI/BANKS
MAIN REPORT AS PER FI NORMS AND IN APPLICATION FORMAT WITH SUPPORT DOCUMENTS/ ADDITIONAL REPORTS SENSITIVE/CRITICAL DATA OR DOCUMENTS TO BE FURNISHED FOR INSPECTION AS AND WHEN NECESSARY

31 ADDITIONAL REPORTS/DOCUMENTS WITH MAIN REPORT
TECHNICAL SPECIFICATIONS FOR BUILDINGS & CIVIL WORKS AND PLANT & MACHINERY COMPARATIVE QUOTATIONS (3 SETS) FOR CIVIL WORKS AND ALL MAJOR MACHINERY & EQUIPMENT MARKET SURVEY REPORT

32 PROJECT SITE TEST REPORTS AND PRELIMINARY CLEARANCES OBTAINED
PROMOTERS’ BACKGROUND, GROUP COMPANY ARRANGEMENTS ALREADY MADE IN THE PROJECT FINANCIAL WORKINGS MODULE (IN FLOPPY)