Presentation is loading. Please wait.

Presentation is loading. Please wait.

BRIDGESTONE/FIRESTONE

Similar presentations


Presentation on theme: "BRIDGESTONE/FIRESTONE"— Presentation transcript:

1 BRIDGESTONE/FIRESTONE
2/22/2019 BRIDGESTONE/FIRESTONE ISO IMPLEMENTATION

2 THE UPSIDE Awareness of Departmental Environmental Aspects.
Raised Profile of Environmental Issues. Systematized Approach to Environmental Management. 2/22/2019

3 AWARENESS OF ASPECTS Managers provided with a worksheet for each of their Environmental Aspects. Worksheets give specific activities required and why they are required. Worksheets also list who’s responsible for the activity. 2/22/2019

4 2/22/2019

5 RAISED PROFILE Bridgestone/Firestone-Wilson’s EMS is integral to its QS-9000 QMS. Raises Environmental Issues up to the level of quality in management’s perspective. All EMS Corrective Action Requests (CAR) are equivalent to Serious QMS CAR 2/22/2019

6 SYSTEMIZATION Setting up EMS requires focus on what is done already, but not analyzed. Different analyses can reveal issues not previously considered. Forces an analysis of permits and regulations. 2/22/2019

7 POLLUTION PREVENTION Eliminated a HAP from rubber cement.
Eliminating same HAP from production solvents. 2/22/2019

8 COSTS Consultants at the Corporate Level
Implementation costs minimized because EMS is in QMS, Used Std Practices from other co. locations. 2/22/2019

9 COSTS Certification - $10,000 to $ 15,000
Included a pre-certification visit. Environmental Department time. 2/22/2019

10 SUMMARY Immediate advantages for Company.
Long range advantages for Environmental Department. 2/22/2019


Download ppt "BRIDGESTONE/FIRESTONE"

Similar presentations


Ads by Google