Presentation is loading. Please wait.

Presentation is loading. Please wait.

Arto Kokkinen ESTAT, unit C.2

Similar presentations


Presentation on theme: "Arto Kokkinen ESTAT, unit C.2"— Presentation transcript:

1 Arto Kokkinen ESTAT, unit C.2
Task Force on GDP Flash estimates at t+30 days Item 5 On GDP t+30 Eurostat estimations 6th Meeting of the TF, Luxembourg 7 October, 2015 Arto Kokkinen ESTAT, unit C.2

2 Content Data work: only on-line estimates to be done … and a little reminder what was done since Jan 15 Results: test estimations, real-time quarters (update) Overview of back and real-time quarters (t+30 vs. t+45) Results with later revisions: t+30 and the consecutive publications, QoQ: EA, EU; YoY: EA, EU Results: comparison with the quality criteria TF T+30, October 2015

3 1. Data work to be done only on-line estimates …
Nr What When Who 1 Test calculations – ‘real time’ provision of national data every quarter from 2014Q1 onwards – transmit your estimates in future in the growth rate triangle (with last quarter updated) End-Oct 2015, End-Jan 2016, etc. 2015Q3 onwards Most TF Members TF Members (ESTAT updates as well) 2 Production of the EU and EA GDP test flash estimates, every quarter from 2014Q1 onwards End-Oct 2015, End-Jan 2016, etc…? ESTAT, CE

4 1. … Data work done Nr What When Who
Test calculations – provision of national back data 2012Q1-2013Q4 December  February 2014 Most TF members Test estimates for EA/EU, back data 2012Q1 – 2013Q4 Spring 2015 – Summer 2015 ESTAT, CE Update of growth rate triangles for revision analyses – , TF Members, ESTAT Revision analysis on the test estimates – , Spring 2015 – Autumn 2015 ESTAT Calculation of data indicators and other analyses for Quality criteria (e.g. unbiasness of t+30?) Summer 2015 – Autumn 2015

5 2. Results test estimates (real-time quarters)…
Here on the left, as previously, you can see the country data used in the estimations In the column T+30 test you can see the t+30 days' estimates And in the column T+45 Flash the t+45 estimate for comparison

6 …2. Results test estimates (real-time quarters)

7 3. Overview, back and real-time, EA (t+30 vs. t+45)
TF T+30, October 2015

8 … 3. Overview, back and real-time, EA (t+30 vs. t+45)
TF T+30, October 2015

9 4. Results QoQ, EA …

10 … 4. Results QoQ, EU

11 4. Results YoY, EA …

12 … 4. Results YoY, EU

13 5. Comparison of results (so far) with quality criteria
Average revision between and +0.05, Now: EU -0.01, EA no more than 67% of revisions at publication level in same direction Now: EU 0: 57%, -: 29%, +: 14% EA 0: 29%, -: 36%, +: 36% T+30 average absolute revision ≤0.10 (to t+45) EU 0.05, EA 0.06 and ≤ 0.13 (to t+65) EU 0.05, EA 0.06 For 2015 coverage national estimates > 70% Six last quarter average: EU 80%, EA 80% (4) Communication plan should be available …. on its way….)

14 Thank you for your attention !
MANY THANKS FOR THE WORK DONE FOR YOUR COUNTRY ESTIMATES ! Please feel free to comment … TF T+30, October 2015


Download ppt "Arto Kokkinen ESTAT, unit C.2"

Similar presentations


Ads by Google