Presentation is loading. Please wait.

Presentation is loading. Please wait.

Central Magnet Ace Team #8

Similar presentations


Presentation on theme: "Central Magnet Ace Team #8"— Presentation transcript:

1 Central Magnet Ace Team #8
Always Our Best

2 Transitional Facility of Murfreesboro, TN
Resilience: the capacity to recover quickly from difficulties; toughness Transitional Facility of Murfreesboro, TN Temporary place (up to 6 months) for families, couples, and singles to stay For those displaced by financial or natural causes Bedrooms, cafeteria, classrooms, and indoor/outdoor rec areas

3 Brainstorming Adjacency Diagram - Basic Layout
Piecing the rooms together

4 Space Program (not NASA)

5 Capital Budget Site Work- $182,000 Building Cost- $8,137,500
Furniture, Fixtures, and Equipment- $1,627,500 Technology- $406,875 Total - $10,353,875

6 Site Plan

7 Floor Plan

8 Building Codes Section 308.3 Institutional Group I-1
Group homes, Residential board, and Halfway homes Type 1-B construction “non-combustible” Sq. ft limit: 55,000 Max Height: 9 stories

9 Schedule

10 Field Trip

11 Thank You For your time


Download ppt "Central Magnet Ace Team #8"

Similar presentations


Ads by Google