1 Deck Building Assignment
Year 9 Measurement

2 POST BEARERS JOISTS

3

4

5 Materials for building a deck
Posts 100 by 100 by 1800mm $10.53 / post Joists and Bearers 150 by 50mm $3.95 / meter (5.4m lengths) Decking 100 X 25mm $2.83 / meter (5.8m lengths) Concrete $13 + GST / bag. Nails $80 / 5Kg of decking nails, $50 for a 5Kg box of 100mm framing nails.

6 The client wants: A scale plan of the deck
The questions answers on the form An added option and price for an extra feature you are offering to help win the bid.

7 Group Roles: Decide on who should do what.
Some ideas: Creative – in charge of added option Calculations guru Group manager Interface with the client Drawing expert Note taker