Presentation is loading. Please wait.

Presentation is loading. Please wait.

Arc Hydro Terrain Processing

Similar presentations


Presentation on theme: "Arc Hydro Terrain Processing"— Presentation transcript:

1 Arc Hydro Terrain Processing
Exercise 3 Input Data HydroID Assignment

2 HydroID Assignment Used in this exercise Unused in this exercise
Catchment HydroID = 535 to 654 (120 Catchments) DrainageLine HydroID = 655 to 774 (120 Drainage Lines) AdjointCatchment HydroID = 775 to 828 (54 Adjoint Catchments) DrainagePoint HydroID = 949 to 1068 (120 Drainage Points) HydroID is always unique – if you create a feature class and then delete it or overwrite it, HydroID’s are all assigned new

3 HydroID - DrainID HydroID of Catchment =
DrainID of DrainageLine and DrainagePoint

4 NextDownID NextDownID = 549 NextDownID = 557 NextDownID = 549
NextDownID of a Catchment is HydroID of next downstream Catchment

5 Tracing by NextDownID Tracing Downstream
Each catchment has only one downstream catchment (like a DEM cell)

6 Upstream Tracing using Next DownID


Download ppt "Arc Hydro Terrain Processing"

Similar presentations


Ads by Google