Download presentation
Presentation is loading. Please wait.
Published byAshley Little Modified over 6 years ago
1
Proposed changes Change the market sectors to NDM MWh NDM 73.2 – 732 MWh NDM > 732 MWh Total NDM Total DM Shrinkage Total Distribution Network Interruptible The identity of the Distribution Network interruptible sites will be needed if they are to be shown separately. Include all the above load bands in the DS1 (load duration curves) and DS6 (daily demand model) spreadsheets. Remove the DS2 (quarterly demand) tables. Remove the DS8 spreadsheet and include selected large loads in the DS3c (supply year annuals) and DS4 (1 in 20 peak day) tables. Rearrange the spreadsheets to improve the layout. For example by putting each of the tables in the DS25 spreadsheet on separate worksheets. Any other changes? These are suggestions only. Your views are welcome. A key decision is whether to continue showing shipper interruptible sites as interruptible. The layout of the spreadsheets will need to change to accommodate new load bands. It therefore seems to be a good time to review the data produced. Are excel spreadsheets still the preferred method of providing this information? Is there any information that is no longer required? Are there better ways of arranging the information?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.