Download presentation
Presentation is loading. Please wait.
1
Why build this new link to Heathrow?
Make greater use of existing investment in Reading station and reduce congestion at Paddington Improve accessibility to Heathrow from the South coast, South West, South Wales and West Midlands Speed up journey times to Heathrow Airport Reduces congestion on M4, M3 and M25 and encourage modal switch Provide greater accessibility to employment locally, nationally and internationally Enhance the UK’s global competitiveness Boost economic growth and jobs to Thames Valley and beyond
2
Potential journey time savings
4 trains per hour in each direction - all trains calling at Reading and Slough - alternative trains calling at Twyford and Maidenhead Station Current average rail journey time Potential new rail link journey time Average car journey time Reading 68 minutes 26 minutes 40-60 minutes Twyford 67 minutes 21 minutes 30-45 minutes Maidenhead 59 minutes 14 minutes 20-35 minutes Slough 52 minutes 6 minutes 15-25 minutes
3
Environmental and economic benefits
Excellent transport links with international markets to secure trade and investment Predicted 42,000 new jobs nationally Predicted over £800m of additional UK economic activity 55% of the journeys are extracted from road More places in the South & South West are within the ‘Golden Hour’ travel time to Heathrow CO2 emissions reduction equivalent to 30 million road miles per year 36 milion road miles off the congested motorway system Additional 20% of UK population within one interchange to Heathrow
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.