1 Technology in Architecture
Lecture 10 Mechanical Systems

2 Mechanical Systems

3 Architect/ Engineer/ Other Trades
Mechanical Systems Organize the Information Rank the energy use Design the building envelope/ Define the thermal zones Verify code compliance Define the HVAC system requirements Select the system(s) Locate primary equipment Locate secondary equipment Locate distribution outlets Locate distribution paths Architect Engineer Architect/ Engineer/ Other Trades

4 Ranking the Energy Use Verify daylight/sunshine availability
Verify costs of energy Verify programmatic uses of energy (HVAC, Lighting, DHW, Process) Verify cost incentive opportunities

5 Design the Building Envelope
Evaluate passive thermal opportunities Confirm material availability Define tectonics Select fenestration and shading systems Jewett Art Center, Paul Rudolph

6 Design the Thermal Zones
Recognize passive solar opportunities and constraints

7 Design the Thermal Zones
Organize program to recognize Function Schedule Orientation Building Form Building Envelope Support Systems

8 Thermal Zones—Functions
Organize program to recognize: Space usage and occupancy needs Temperature/humidity requirements Thermal inter-relationships

9 Thermal Zones—Schedule
Organize program to accommodate diverse schedules Time of day for compatible uses Interaction/noninteraction of uses

10 Thermal Zones — Orientation
Organize program to use orientation to enhance opportunities for: Direct sun Daylight Microclimates Banff Aquatic Center, Alberta, CN

11 Thermal Zones — Building Form
Organize program to reflect building form Load dominance Self-shading Price Tower, Frank Lloyd Wright

12 Thermal Zones — Building Envelope
Organize program to recognize opportunities for: Single skin Double skin

13 Thermal Zones—Support Systems
Organize program to recognize support systems effects: Centralized vs. decentralized Distribution paths Raised floor/ceiling plenum Controls S: p. 433, F.10.48

14 Support Systems — Controls
Control systems: Thermostats Building automation systems

15 Controls — Thermostats
Do not locate on exterior wall Do not locate in direct sun Do not locate in direct path of HVAC discharge Do not include portions of separate rooms Locate in the zone it controls Locate in return air ducts

16 Controls—Automated Building automation systems
User access to override features Centralized control station vs individual control S: p. 430, F.10.45

17 Verify Code Compliance
ASHRAE 90.1—Energy Code for Nonresidential Buildings ASHRAE 90.2—Energy Code for Residential Buildings ASHRAE —Ventilation Code

18 Define HVAC System Requirements
Space conditions for temperature & humidity Condition ranges & tolerances Summer & Winter design conditions

19 Select Systems Based on: Performance capabilities
Space psychrometric criteria Construction cost Operating Cost Solar Heliostats Solar Power(ful)

20 Locate Primary Equipment
Primary equipment uses raw energy to generate heating and cooling media (chilled water, hot water, or steam) Boilers Chillers Cooling Towers Accessory equipment (pumps, tanks, etc) Thermal storage systems

21 Locate Primary Equipment
Location factors Service access at grade or below grade with truck dock Size/Volume Noise Fire safety Security Future expansion of mechanical plant LNCO Mechanical Room (during construction)

22 Locate Primary Equipment
Location factors Service access at grade or below grade with truck dock Size/Volume Noise Fire safety Security Future expansion of mechanical plant S: p. 380, F.10.2a

23 Locate Secondary Equipment
Secondary equipment uses generated media to distribute conditioned air or water to individual thermal zones Air handling units (with coils) Heat exchangers Accessory equipment Marriott Library Fan Room

24 Locate Secondary Equipment
Location factors Adjacent to/within zone served Service access Size/Volume Noise Fire safety Security S: p. 380, F10.2

25 Locate Secondary Equipment
Location factors Adjacent to/within zone served Service access Size/Volume Noise Fire safety Security S: p. 380, F.10.2a

26 Locate Secondary Equipment
Location factors Adjacent to/within zone served Service access Size/Volume Noise Fire safety Security S: p. 380, F.10.2b

27 Locate Secondary Equipment
Location factors Adjacent to/within zone served Service access Size/Volume Noise Fire safety Security S: p. 380, F.10.2c

28 Locate Secondary Equipment
Location factors Adjacent to/within zone served Service access Size/Volume Noise Fire safety Security S: p. 380, F.10.2d

29 Locate Secondary Equipment
Location factors Adjacent to/within zone served Service access Size/Volume Noise Fire safety Security

30 Locate Distribution Outlets
Distribution occurs via: Air diffusers/ registers Perimeter radiation Panel radiation (floor or ceiling) LNCO Dean’s Office Ceiling Space

31 Locate Distribution Paths
Connect distribution outlets to secondary equipment LNCO Fan Room

32 Locate Distribution Paths
Ductwork and piping can be located in vertically aligned chases or in ceiling space over corridors Architect is responsible for locating access panels where needed G. H. Schettler House

33 Locate Distribution Paths
Connect secondary equipment to primary equipment Use vertical and horizontal zoning to coordinate trades

34 Locate Distribution Paths
Coordinate all trades for service access and space allocations Equipment and access panels should be located away from occupied space when possible LNCO System Distribution Coordination

35 Distribution Paths Interstitial floors for mechanical-electrical systems may be used to eliminate service/ user interaction UM Hospital Campus

36


Download ppt "Technology in Architecture"