Download presentation
Presentation is loading. Please wait.
Published byTatiana Thistlethwaite Modified over 10 years ago
1
TERCERO PHASE II NEW CONSTRUCTION, LEED GOLD David Mogavero Patrice Coffman
2
Project Profile Tercero Student Housing, Phase II 155,000 square feet $35 million 592 beds Sep. 2010 completion Architect: Mogavero Notestine Associates Contractor: Brown Construction
5
Energy exceeded Title 24 by 32% savings of 572,145 kWh + 3,576 therms = $52,744 high- performance windows solar thermal
7
Water project reduction of water use by 41% 30% from fixtures 11% from process water
8
Indoor Environment increased ventilation by 30% rapidly renewable material recycled content material low or no VOC lighting controls
9
Innovation Green Cleaning Policy & Program education program (CIR 9/24/2001) green furniture building metering
10
Occupant Satisfaction 93.3% of occupants are satisfied reliance on natural light
11
CUARTO DINING COMMONS COMMERCIAL INTERIORS, LEED GOLD David Mogavero Patrice Coffman
12
Project Profile Cuarto Dining Commons 18,430 square feet $7.9 million Sep. 2010 completion design/build Design Architect: Stafford King Wiese Architect of Record: Mogavero Notestine Associates Contractor: Valley Construction
13
Existing Interior cafeteria style low ceilings dark small rooms multiple renovations
14
Design – First Floor
15
Design – Second Floor
16
Energy 25% more efficient than Title 24-2001 40% reduction in lighting density solar thermal Melink system
17
Interior
19
Outcome a destination showcase dining facility support UC sustainable food goals education program (CIR 9/24/2001)
25
David Mogavero dmogavero@mognot.com Patrice Coffman pcoffman@ucdavis.edu images from Frank Domin, Christopher Fallon, Julianne Nola, UC Davis, and Mogavero Notestine Associates Contact and Credit Information
26
This concludes The American Institute of Architects Continuing Education Systems Program
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.