m -> eg Drift Chambers
Test Chambers Tokyo and mini-Prototype Further Development and Tests Double Cathode Test Chamber Charge Division Test Chamber Chamber Construction (Alignment and Calibration) (Software Development) Schedule and Man power Je 15/07/2002
2
Je 15/07/2002
3
Second stage of amplification
New Preamplifier parallel resistor to easily adapt input impedance Geometrical requirements to be mounted directly on the frame Second stage of amplification Same chip Outside COBRA Anode and cathode prints Je 15/07/2002
4
Layout showing 2 of the 3 channels of the new preamplifier
Je 15/07/2002
5
Schematic view of anodes and cathodes
Add half a dummy cell double central cathode Je 15/07/2002
6
Cathode shape and resolution
Triple-strip vernier 2 double-strip cathode Momentum resolution .9 % FWHM Efficiency 98 % -> % Better homogenous position resolution Cross Talk between 2 central cathode Gas, magnetic field „auto calibration“ Test THREE BONDS 1350 Je 15/07/2002
7
Test Prototype 2 Je 15/07/2002
8
Auto calibration with cosmic and particles in magnetic field, cross talk, gas optimization in magnetic field Je 15/07/2002
9
Charge Division Test Chamber
W(330 W/m) or Steel(1200 W/m) Anode print and readout Test THREE BONDS 1350 Je 15/07/2002
10
Cathode hood Je 15/07/2002
11
Cathode foil Tension : Dl /l = 1.0 % , Dw /w = 0.5 %
Je 15/07/2002
12
Gas tightness Je 15/07/2002
13
Je 15/07/2002
14
Je 15/07/2002
15
Je 15/07/2002
16
Chamber support Complete chambers system with cables and supplies as one block in and out Chamber always returns at the same position in the support Je 15/07/2002
17
Alignement and calibration
Chambers block measured outside COBRA cosmic muons or beam particles (each anode and cathode relativ to the others) position cathode reference point to the support reference: „Vermessungsgruppe“ Position target Edge of Michel spectrum Calibration run with small targets Al , S Different z positions ,vary cos(q) Je 15/07/2002
18
Software development No calculations done in „DC group“
Wait for Results from R%D Charge clusters in pulse shape and pileup Experimental tails Behaviour in magnetic field Cross talk Manpower Je 15/07/2002
19
Je 15/07/2002
20
schedule prints Cath. Amp. frame tests t P 1:1 c DC j a s o n d f m
Cath. Amp. frame tests t P 1:1 c DC Schwdule drfgdgfdgdfgs Je 15/07/2002