1 PCS User Group 15th February, 2017

2 Short Term Path Request - feasibility study -

3 Short Term Path Request
Problem: Offers are not available from the RFCs on the real short term (e.g. within 5 days) 30 days Reserved Capacity is designed for interim requests Meetings: 9th January, Vienna: Preparation meeting Definition of the variables Announcement of the possible approaches 3rd February, Vienna: Detailed discussion on the possible approaches, pilots Timeline definition Variables: request deadline, role of C-OSS, use of PaPs, number of operation days, scope of products, handling of double requests Approaches: Baltic-Adriatic: use of the regular Ad-Hoc process with the national OSS. C-OSS is not involved in the dossiers, only monitoring based on reports ScanMed and Orient/East-Med: active C-OSS with some kind of PaP products for the time being (PCS’s need for the C-OSS) 22 February 2019

4 Timeline April 2017 - Definition of technical requirements towards PCS
June Detailed description of process steps July Technical evaluation of the technical requirements for PCS November Eventual roll-out in PCS To elaborate on a detailed description of the second pilot a separate workshop will be organised by RNE on 7th April 2017 from 9:00 to 15:00 in Vienna Invitees: C-OSS Managers Timetabling experts 22 February 2019

5 Result of the Test Group

6 Report about PCS Test Group
Minor features: Improved usability when adding a location in a TT (1196) Path number copied to subsidiary (1231) Used terminology in creating and managing PaP (1186) Always show Dossier ID on PCS GUI (1178) Edit calendar (1172) Mandatory Traction details – Default (1152) Special focus during the test: Loco types from RU and IM aspect Search for Observation Acceptance GTC of RFCs PAMT report of RFCs 22 February 2019

7 Report about PCS Test Group
22 February 2019

8 Development plans for 2017

9 Development plan Minor 2017 Dates: End of development: 25th February
Release Candidate: 2nd March Deploy in Production: 3rd April Content: Search for Observations: new column in the result only in Observations and Post-Processing PaP Availability Management Tool (PAMT): search and Excel report Conflict Solving Tool for RFCs UpdateDossierRUIMPair web-service operation adjustment: update based only on the referred pair, the rest stays untouched Trivials: Improved usability when adding a location in a TT (1196) Path number copied to subsidiary (1231) Used terminology in creating and managing PaP (1186) Always show Dossier ID on PCS GUI (1178) Edit calendar (1172) Mandatory Traction details – Default (1152) 22 February 2019

10 Development plan Major 2017 Dates: End of development: TBD
Release Candidate: 2nd November (plan) Deploy in Production: 13th November Content: TAF-TSI Short Term Path Request Pilot (for August): Pre-accepted offer in Ad-Hoc Path Request process Acceptance phase adjustment (Accept/Refuse/Ask for adaptation) Format changes Test environment preparation (maintenance work) IP Consolidation package (Interface): Removal of PCS IP middle layer, connection directly to PCS Core Solving performance issues PaP Product definition 1st step: Pre-Booking phase for RFCs Acceptance indicator adjustments for RFCs (light separation, downgrade to blue) Loco types 22 February 2019

11 Development plan Minor 2018: Dates End of development: TBD
Release Candidate: TBD Deploy in Production: TBD (beginning of April) Content: PaP Product definition 2nd step: C-OSS timetable Alternative offer Major 2018: Deploy in Production: TBD (mid of November) PaP Product definition 3rd step: New PaP product in place 22 February 2019

12 In addition to the developments
Trivials between approximately 5-10 per releases can be included in each release Where to put the big ones? Envelope Concept Single Border Point Approach Short Term Path Request process for RFCs Non-RU Applicant Terminals Etc. Things are coming always… Resources are limited Proposal will be presented to RNE GA on 4th May 22 February 2019