Presentation is loading. Please wait.

Presentation is loading. Please wait.

Sections 1-3: Standard Section 4: Math

Similar presentations


Presentation on theme: "Sections 1-3: Standard Section 4: Math"— Presentation transcript:

1 Sections 1-3: Standard Section 4: Math
PMBoK Chapter 7 Sections 1-3: Standard Section 4: Math

2 Outline

3 Section 7.1: Note that this is first bubble in previous slide…

4 Section 7.2: Note that first input is output from previous slide.

5 Section 7.3: Note that three inputs come from 7.1 and 7.2 outputs.

6 Section 7.4: Earned Value Management (EVM) Methodology that combines scope, schedule, and resource measurements to assess project performance and progress (with a dozen acronyms). Example: A million dollar project is planned to be done in 16 months. After 8 months, the data is: AC = $580,000 PV = EV = $430,000 a) What are the BAC and what do the three items above mean? b) Calculate and interpret the remaining eight earned value statistics.


Download ppt "Sections 1-3: Standard Section 4: Math"

Similar presentations


Ads by Google