Overarching Commissioning Plan

Similar presentations


Presentation on theme: "Overarching Commissioning Plan"— Presentation transcript:

1 Overarching Commissioning Plan
Ritendra Bhattacharya LCLS-II Commissioning Workshop December 4 & 5, 2018

2 Outline Introduction Commissioning responsibility
Commissioning readiness Pre-commissioning Sequence of commissioning Overarching schedule Predecessor LCLS-II Commissioning Workshop, Dec 4 & 5, 2018

3 Introduction Installation scope: Identifying activities and completion timelines in support of commissioning readiness for the cryoplant subsystems. Pre-commissioning: Dealing with mechanical and electrical check out and system cleanups Commissioning: Dealing with commissioning and performance of the following sub-systems Auxiliaries Helium compression 4.5 K Cold box 2 K Cold Box Operation: Dealing with operation of subsystems post handoff during commissioning of rest of the subsystem. Example, operation of rest of the cryoplant subsystems during commissioning of 2 K cold box. LCLS-II Commissioning Workshop, Dec 4 & 5, 2018

4 Commissioning Responsibility for Cryoplant
SRR ERR Installation Commissioning Readiness Pre-commissioning & Commissioning Performance Test Handoff Auxiliaries Compressors 4.5 K Cold Box 2 K Cold Box JLAB Engineering, Pre-Commissioning & Commissioning Support JLAB Vendor Support SLAC Engineering, Pre-Commissioning & Commissioning Support SLAC Installation Support SRR System Readiness Review ERR Equipment Readiness Review LCLS-II Commissioning Workshop, Dec 4 & 5, 2018

5 Cryoplant Commissioning Readiness
Installation* Completion Installation Test Report Availability of Facility Availability of … System Pressure Tested and Leak Tested Loop check Continuity (up-to Terminal block) Circuit filled with Air or N2 Cold Compressor / Turbines Cartridges installed Automatic valves and safety valves installed Charcoal filling complete Accessibility ensured Pressure Safety System (pressure tests, relief valve/device test/check) Leak tests Electrical checkout Control & Communication checkout Electric power (Lock out/tag out) Tower Cooling Water Helium Gas contract/requisition Liquid Nitrogen contract/requisition Control room established Measure to safeguard Co-occupancy of CP2 Installation and CP1 Commissioning. Resources (JLab\SLAC\Vendor) ODH classification and detection, alarms established Safety reviewed & ensured Tooling\Consumable\Spares Documentation / Procedures NOTE: *including General contractor’s and reassembly contractor’s scope of work LCLS-II Commissioning Workshop, Dec 4 & 5, 2018

6 Instrumentation and Control Checkout
Pre-commissioning Mechanical Checkout Electrical Checkout Instrumentation and Control Checkout System Cleanup Piping and U-tubes properly connected with subsystem Vent/drain connected Safety valves properly connected Utility availability check Vacuum system with cold trap connected Lock out/tag out complete Power is connected Breakers have properly rated fuses and trip set points Electrical motor checkout Instrumentation signal loop checkup Instrument calibration check Valves (pneumatic & electric) functionality check Control network and communication checkout Local and remote control system checkout Alarms properly activated Purge/Fill cycles* Adsorber cleanup He filling/pressurization He Circulation / Flushing NOTE: *Longer activity for He Gas Tanks, LN2 Dewar cleanup and moisture removal LCLS-II Commissioning Workshop, Dec 4 & 5, 2018

7 Idealized Sequencing of Subsystem Commissioning
AUXILIARIES COMPRESSORS 4K COLD BOX 2K COLD BOX Nitrogen System (Storage & Distribution) Air Compressor & Distribution Cooling Water - Compressors Recovery Compressors Helium Gas Analyzers Helium Purifier Helium Gas Storage Tanks and Filling Adsorbers (Cleanup, moisture removal) Oil Processor (initial oil processing by vendor) Motor Control Center Filling clean oil & Helium Helium Compressors with Oil Removal System Oil Management System Adsorbers (Cleanup, moisture removal) Secondary Cooling Water loop Insulation Vacuum System Filling of Clean Helium 4 K Cold Box cool down LHe Dewar cool down Performance Test with heater Helium Filling Test Heater Insulated Vacuum System Guard Vacuum Magnetic bearing tuning 2 K Box cool down Cold Compressor Performance NOTE: Including subsystem interconnecting warm and cold piping as appropriate LCLS-II Commissioning Workshop, Dec 4 & 5, 2018

8 Overarching Schedule – CP1
CP1 - In Summary: Pre-commissioning………..7 months Aux Commissioning……….3 months Helium Compression………4.5 months 4 K Cold Box………………..4 months 2 K Cold Box………………..2 months Total (with overlapping)……13.5 months LCLS-II Commissioning Workshop, Dec 4 & 5, 2018

9 Overarching Schedule – CP2
CP2 - In Summary: Pre-commissioning………..7 months Aux Commissioning……….1 months Helium Compression………4.5 months 4 K Cold Box………………..4 months 2 K Cold Box………………..2 months Total(with overlapping)…… months LCLS-II Commissioning Workshop, Dec 4 & 5, 2018

10 Installation contractor delivery sequence by subsystem
We need to address the following Installation completion dates as schedule predecessor for Auxiliary commissioning Helium Compressor commissioning 4.5 K CB Commissioning 2.0 K CB Commissioning Date 1? Date 2? Date 3? Date 4? LCLS-II Commissioning Workshop, Dec 4 & 5, 2018

11 THANK YOU FOR KIND ATTENTION
LCLS-II Commissioning Workshop, Dec 4 & 5, 2018