2 Chapter Three Aggregate Planning

3 The Hierarchy of Production Planning Decisions
Fig. 3-1 The Hierarchy of Production Planning Decisions

4 Cost of Changing the Size of the Workforce
Fig. 3-2 Cost of Changing the Size of the Workforce

5 Holding and Back-Order Costs
Fig. 3-3 Back-orders Positive inventory Slope = CP Slope = Ci $ Cost Inventory

6 A Feasible Aggregate Plan for Densepack
Fig. 3-4 A Feasible Aggregate Plan for Densepack

7 A Convex Piecewise-Linear Function
Fig. 3-5 A Convex Piecewise-Linear Function

8 Convex Piecewise-Linear Hiring Cost Function
Fig. 3-6 Convex Piecewise-Linear Hiring Cost Function

9 Quadratic Cost Functions Used in Deriving the Linear Decision Rule
Fig. 3-7 Quadratic Cost Functions Used in Deriving the Linear Decision Rule