Presentation is loading. Please wait.

Presentation is loading. Please wait.

Financial Markets Development Plan (FMDP)

Similar presentations


Presentation on theme: "Financial Markets Development Plan (FMDP)"— Presentation transcript:

1 Financial Markets Development Plan (FMDP)
Uganda: Financial Markets Development Plan (FMDP) Bbira Bbosa Loy Muhwezi Dhamuzungu Peter Charles Malinga Akol Nakoko Masuba Patrick

2 SETTING DESCRIPTION 2/23/2019

3 INTERVENTION DESCRIPTION 1
Uganda has made some progress in the following areas; Regulation and supervision of financial sector institutions Stabilisation of fiscal and monetary policies Infrastructure development Human resource development/capacity building As a result price stability and a sound financial system have been achieved 2/23/2019

4 INTERVENTION DESCRIPTION 2
However, financial markets have remained shallow and narrow The FMDP was developed to address the shortcomings The goals ;Financial Deepening, Regulatory Reforms, Capacity Building and Infrastructure Development, Efficient Intermediation, Increasing Investor Base and Financial Literacy. Use impact evaluation techniques to evaluate impact of carrying out financial literacy in Tertiary Institutions and small scale industries. 2/23/2019

5 EVALUATION QUESTIONS Take-up? Impacts?
Applications received show a very high take-up. This will enable us measure participation in the financial markets activities of treatment group Impacts? Increase in the accounts opened in banks Insurance policies taken up Increase in numbers of retail investors in the stock exchange Increase in trading volumes in the financial markets Improved savings and investor culture 2/23/2019

6 EVALUATION DESIGN Applications from Tertiary Institutions (TIs) and Small Scale Industries (SSIs) in central region. Randomization within institutions and small scale industries. We will conduct stratified randomization, stratified by industry type and gender and education specialty. 50% of the participants within each institution/small scale industry assigned to treatment Selection is made public with “control” group offered “guaranteed” training in 6 months time. 2/23/2019

7 Evaluate impact by conducting end line survey in 8 months.
SAMPLING AND DATA Baseline survey on both treatment and control institutions before intervention. Evaluate impact by conducting end line survey in 8 months. 2/23/2019

8 IMPACT EVALUATION PROJECT
THANK YOU 2/23/2019


Download ppt "Financial Markets Development Plan (FMDP)"

Similar presentations


Ads by Google