Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG11 Snapshot November 08 Date: Authors: Name Company

Similar presentations


Presentation on theme: "WG11 Snapshot November 08 Date: Authors: Name Company"— Presentation transcript:

1 WG11 Snapshot November 08 Date: 2008-11-09 Authors: Name Company
doc.: IEEE /1299r1 November 2008 WG11 Snapshot November 08 Date: Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

2 What are the LMSC P&P? November 2008
doc.: IEEE /1299r1 November 2008 What are the LMSC P&P? P&P is short hand for Policies and Procedures LMSC P&P are the ‘rules’ that govern the IEEE 802 LMSC LMSC P&P can be found at Working groups also have P&P Other ‘Governance’ documents from IEEE Standards Association IEEE Computer Society P&P Review Session usually held Sunday Night before Plenary Review current P&P issues All participants welcome Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

3 Summary of P&P Activities
November 2008 Summary of P&P Activities Ballot to create OM was held Find materials at Comment resolution is on going No comments since most recent resolution in 8/08 Will hold approval vote in Friday EC meeting Held Sunday Night P&P Review Discussed current AudCom activities Discussed possible activities after OM revision complete Bruce Kraemer (Marvell)

4 Current P&P Issues Restructuring of P&P per AudCom Baseline WG P&P
November 2008 Current P&P Issues Restructuring of P&P per AudCom Creation of Operations Manual Approval vote Planned for Friday Baseline WG P&P IEEE-SA AudCom is creating baseline WG P&P LMSC will need to formally review of WG P&P Must compare to AudCom baseline WG P&P AudCom will do ‘spot checks’ May need adjustment to LMSC OM or P&P Bruce Kraemer (Marvell)

5 Questions on LMSC P&P? Contact Matthew Sherman
November 2008 Questions on LMSC P&P? Contact Matthew Sherman Bruce Kraemer (Marvell)

6 WG11 Task & Study Group Officers
November 2008 WG11 Task & Study Group Officers Group Chair Vice Chair Technical Editor Secretary WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Terry Cole Peter Ecclesine David Hunter Mb Matthew Gast Michael Montemurro -OPEN- N Sheung Li P Lee Armstrong none Wayne Fisher Susan Dickey S Donald Eastlake Stephen Rayment U Stephen McCann Necati Canpolat V Dorothy Stanley Emily Qi W Jesse Walker Nancy Cam-Winget Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Hang Liu AC VHT Eldad Perahia Bruce Kraemer (Marvell)

7 WG11 Appointments, ad hocs, Standing Committees
November 2008 doc.: IEEE /1299r1 November 2008 WG11 Appointments, ad hocs, Standing Committees WG Functions Treasurer – Jon Rosdahl Publicity – Stephen McCann WG Editor – Terry Cole WG Secretary – Stephen McCann Standing Committees WNG – TK Tan ARC – David Bagby, VC Darwin Engwer Ad hoc Committees IMT Advanced – Darwin Engwer, Bruce Kraemer JTC1 – Jesse Walker M.1801 – Peter Ecclesine Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

8 Activity Index Study Groups Task Groups VHT mb WG Editor n p
November 2008 Activity Index Study Groups VHT WG Editor Standing Committees WNG ARC Ad hoc Committees IMT-ADV JTC1 M.1801 Task Groups mb n p s u v w y z aa ac Bruce Kraemer (Marvell)

9 Amendment Activity Description
November 2008 Amendment Activity Description Task Groups K - Network Measurement Mb - maintenance N – Hight Throughput R – Fast Roaming S – Mesh Networking T – Testing Recommendations U - Handover V – Network Management W – Security Y – Contention Based Access to 3650 MHz Z – Direct Link AA – Video Transport AC – Very High Throughput, below 6, areal coverage improvement Bruce Kraemer (Marvell)

10 Activity Status Task Groups K - published (D13.0) Mb - maintenance
November 2008 Activity Status Task Groups K - published (D13.0) Mb - maintenance N – WG recirc for D7.0 completed – opening sponsor ballot pool R – published (D9.0) S – Developing Draft (D2.0) T – Terminated, PAR being withdrawn (D1.01) U - Developing Draft, LB137 passed (D4.0) V – Developing draft, LB133 failed (D3.0) W – WG recirculation completed, Requesting Sponsor ballot (D6.0) Y – published(D11.0) Z – Revising draft, preparing for recirculation (D1.1) AA – Developing draft, coordinating with 802.1ab Bruce Kraemer (Marvell)

11 Activity Index Study Groups VHT – Proposing new PAR for 60 GHz
November 2008 Activity Index Study Groups VHT – Proposing new PAR for 60 GHz WG Editor Standing Committees WNG – Technical innovation proposals ARC – Analysis of architecture current and possible future Ad hoc Committees IMT-ADV – Contributing to evolution of WP5D requirements JTC1 – Coordinating conversations with China regarding WAPI IETF – coordination on special common interest topics M.1801 – revising text changes for input to ITU-R via WG18 Bruce Kraemer (Marvell)

12 Editors Goals for November 2008 Meeting
March 2008 doc.: IEEE /03399r0 doc.: IEEE /1299r1 November 2008 Editors Goals for November 2008 Meeting Meet with all editors (Tuesday 7am) Review status of ongoing publication projects Resolve ongoing numbering of items in drafts (08/0644r3) Discuss Numbering of Annexes and other streamlining items Update editor contacts and publish in closing report Update draft information and publish in closing report ANA database Receive requests Update Slide 12 Bruce Kraemer (Marvell) Page 12 Terry L Cole, AMD Bruce Kraemer (Marvell)

13 WNG SC – Meeting Goals Nov 08
November 2008 WNG SC – Meeting Goals Nov 08 Review WNG SC Plans Scheduled Presentations Broadband Access for High Speed Transportation TV white space FCC action Hybrid MAC for VANET Security Of Wireless Networks: How Low-Layer Security Can Help Facilitate technical presentations Organize presentations by topic/theme Bruce Kraemer (Marvell)

14 November 2008 doc.: IEEE /1299r1 November 2008 IEEE ARC SC – November 2008 Held 2 conference calls since since September sessions Continued work on MAC internal Architecture model This week Continue work on MAC model Agenda in document Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

15 TGmb Nov 2008 Summary Still willing to accept Chair/Editor/Secretary
November 2008 doc.: IEEE /1299r1 November 2008 TGmb Nov 2008 Summary Still willing to accept Chair/Editor/Secretary Matthew Gast has stepped up for Chair Michael Montemurro is the Vice-Chair Jon Rosdahl will be the Secretary One Interpretation received. DLS Response Frame question Requests for corrections/improvements Due Today (Nov 10, 2008) First WG LB targeted March 2009 Target for Revision is Mar 2011 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

16 IEEE 802.11n – November 2008 LB136 passed on D7.0
doc.: IEEE /1299r1 November 2008 IEEE n – November 2008 LB136 passed on D7.0 48 comments Comment resolution began Oct 03 Primary session activity will be comment resolution November Goals Start LB on Draft 7 following November meeting Requesting EC to approve conditional Sponsor Ballot TGn opening report is submission 11-08/1297 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

17 TGp Snapshot for November 2008
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /1299r1 November 2008 November 2008 TGp Snapshot for November 2008 Trying to finalize LB 125 comment resolutions Added time slots since original agenda, now have 7 All comments resolved in September, need to revisit some, verify that all are properly resolved. Plan to ballot after this week Slide 17 Bruce Kraemer (Marvell) Page 17 John Doe, Some Company Bruce Kraemer (Marvell)

18 IEEE 802.11s Mesh Networking – Nov 08
May 2008 November 2008 doc.: IEEE /0547r0 doc.: IEEE /1299r1 November 2008 IEEE s Mesh Networking – Nov 08 TGs agenda is in submission 11-08/1194r2. Anthony Maida is unable to continue as TGs Editor due to lack of sponsorship. Anyone with any interest in being TGs Editor should contact the TGs chair, Donald Eastlake. TGs is resolving the 1,958 comments it received in failed LB #126 on s Draft 2.0. The current comment resolution spread sheet is 11-08/493r22. Resolution status as of the end of the Jacksonville, Denver, and Waikoloa meetings was as listed below (Waikoloa numbers subject to revision): LB #126 Closed Thru Jacksonville Closed Thru Denver Closed Thru Waikoloa Total 1964 100% 474 24% 783 40% 1368 70% Editorial 656 33% 297 45% 450 69% 545 91% Technical 1308 67% 177 14% 333 25% 823 60% Slide 18 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 18 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

19 802.11T - Meeting Goals - – Nov 08 Work on Withdrawing TGT PAR
November 2008 802.11T - Meeting Goals - – Nov 08 Work on Withdrawing TGT PAR Discussion on document publication – Wed mid week Bruce Kraemer (Marvell)

20 IEEE 802.11u – November 2008 Review of teleconferences
doc.: IEEE /1299r1 November 2008 IEEE u – November 2008 Review of teleconferences LB 137 Comment Resolution For 118, Against 34, Abstain 37 (Passed 77.6%) Same number of negative votes as last letter ballot ! Technical Submissions this week Liaisons (3GPP, NENA, ATIF) Agenda in document r0 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

21 November 2008 doc.: IEEE /1299r1 November 2008 IEEE v – November 2008 Held 4 con calls, Mon AM ad-hoc since September session This week LB 133 Comment Resolution Hear Presentations Letter Ballot Agenda in document Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

22 TGw Meeting Status & Objectives – Nov 08
November 2008 doc.: IEEE /1299r1 November 2008 TGw Meeting Status & Objectives – Nov 08 TGw Status Initial sponsor ballot for P802.11w passed (85% affirmative) 270 comments received EMC hosted Ad Hoc in Santa Clara Oct 9-10 3 Conference Calls Since Waikoloa Ad Hoc today prior to the 802 Plenary TGw has adopted resolutions for 133 comments and assigned 105 editorial comments to the editor See doc r8 TGw to meet 4 times this week Tuesday 16:00-18:00, Wednesday 16:00-18:00, Thursday 8:00-10:00, 10:30-12:30 Goals: Finish sponsor ballot comment resolution and recirculate P802.11w D7.0 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

23 TGy – November 08 Publication Announced Accept congratulations
doc.: IEEE /1299r1 November 2008 TGy – November 08 Publication Announced Accept congratulations Relax on the Grassy Knoll Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

24 November 2008 IEEE z – November 2008 TGz resolved most of the comments that were received for LB135! The goal for this meeting is to start a new letter ballot Summary of TGz: TGz defines a protocol to set up direct links without support at the AP (by encapsulating setup information in Data frames which can be tunneled through the AP) TDLS – Tunneled Direct Link Setup TGz also specifies power save for direct link TGz specifies off-channel direct link, which moves the direct link to another channel while retaining the connection with the BSS Bruce Kraemer (Marvell)

25 IEEE 802.11aa – Robust Audio/Video Streaming – Nov 08
November 2008 May 2008 doc.: IEEE /1299r1 doc.: IEEE /0547r0 November 2008 November 2008 IEEE aa – Robust Audio/Video Streaming – Nov 08 Since Waikoloa 4 Teleconferences focused primarily on joint meeting with 802.lAVB – e tutorial in document 08/1214r1. Goals for Dallas Session Map OBSS, Broadcast/Multicast proposals to the requirements Listen to Proposals Joint meeting with 802.1AVB Mapping between and 802.1Qat Updates on 802.1AS Enter the Los Angeles Interim with TGaa Draft 0.01 Opening Report is in document 08/1257r0 Slide 25 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 25 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

26 VHT SG – Meeting Goals – Nov 08
November 2008 doc.: IEEE /1299r1 November 2008 VHT SG – Meeting Goals – Nov 08 VHTL6 (TGac) Officer Election Start developing task group documents VHT60 Complete PAR & 5C’s Bring motion to approve PAR to WG & EC Technical submissions Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

27 IEEE 802.11 IMT-Advanced – November 2008
doc.: IEEE /1299r1 November 2008 IEEE IMT-Advanced – November 2008 Technical portion of Circular Letter was completed in October 2008 (Korea) October 7 workshop held WG11 Session Goals Review IMT-Advanced Status Review discussions held with WG21 in September Review WG18 plans for November Review concept of 802 contribution Discuss WG11 project options Present project recommendation to WG11 on Friday Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

28 JTC1 Meeting Status – Nov 08
November 2008 doc.: IEEE /1299r1 November 2008 JTC1 Meeting Status – Nov 08 Highlights from ISO/IEC JTC1/SC6 Plenary in Montreux, Switzerland, November 3-7 China to decide how to progress WAPI by June 2009 JTC1/SC6 Secretariat to circulate IS and TR proposals for comments Central issue of integration recognized by China, but they appear unwilling to assume any of the costs Suggestion: force the issue by progressing IEEE to DIS Fast Track Revision of progressing Preserve document naming conventions, catalog of approved standards Liaison Statement from JTC1/SC6 to IEEE 802 SC6 encourages IEEE 802 to continue to use JTC1 DIS Fast Track process instead of the PSDO FDIS process SC6 encourages IEEE 802 to seek Class A liaison relationship with JTC1/SC6 See 11-08/1302 for more details Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

29 November 2008 M.1801 ad hoc – Nov 2008 Created draft text for response to ITU-R inquiry Text missed submission deadline for review cycle –deferred Also notified of need to revise M.1450 Coordinate further changes with WG 18 Bruce Kraemer (Marvell)

30 November 2008 Recent Ballots Bruce Kraemer (Marvell)

31 November 2008 TGn – LB 136 This ballot was a 15 day Technical, Fifth Recirculation Letter Ballot for IEEE n - Draft 7.00. asking the question “Should TGn Draft 7.0 be forwarded to Sponsor Ballot?” Ballot Opening Date:  Monday September 15, 2008 - 23:59 ET Ballot Closing Date:   Tuesday September 30, 2008 - 23:59 ET  RESPONSE RATE: 325 eligible people are in this ballot group.     276 affirmative votes    17 negative votes     21 abstention votes ===   314 votes received  =  96.6 % valid returns                                     =   6.7 % valid abstentions This ballot has met the 50% returned ballot ratio requirement. The ballot abstention rate was less than 30%.   APPROVAL RATE: 276  affirmative votes       =  94.2 % affirmative   17  total negative votes  =   5.8 % negative The 75% affirmation requirement has been met.   Bruce Kraemer (Marvell)

32 November 2008 TGU – LB 137 This ballot was a 15 day Technical, 1st Recirculation  Letter Ballot asking the question “Should TGu Draft 4.0 be forwarded to Sponsor Ballot?” Ballot Opening Date:           Tuesday       Sep 23, :59 ET Ballot Closing Date:             Wednesday Oct 08, :59 ET  213 eligible people are in this ballot group.  118 affirmative votes   34 negative votes    37 abstention votes ====  189 votes received RESPONSE RATE:  189 votes received  = 88.7% valid returns This ballot has met the 50% returned ballot ratio requirement ABSTAIN RATE:   37 abstain votes   = 19.6% valid abstentions This ballot has met the less than 30% abstain votes requirement APPROVAL RATE:  118  affirmative votes     =     77.6% affirmative   34  total negative votes  =     22.4% negative The 75% affirmation requirement has been met. Motion passes. Bruce Kraemer (Marvell)

33 November 2008 TGW Sponsor Ballot 1st Sponsor ballot ran from August 22 to September 24 148 eligible to vote 116 votes received, meeting the 75% return rate Passed : 85% affirmative 270 comments generated Expect recirculation out of the Dallas meeting Bruce Kraemer (Marvell)


Download ppt "WG11 Snapshot November 08 Date: Authors: Name Company"

Similar presentations


Ads by Google