Download presentation
Presentation is loading. Please wait.
1
HRb SG Status Report to 802.11 Working Group
July 2000 HRb SG Status Report to Working Group Matthew B. Shoemake, Ph.D. HRb SG Chairperson Matthew B. Shoemake, Alantro Communications
2
Status of PAR and 5 Criteria
July 2000 Status of PAR and 5 Criteria Vote on approval of PAR will be taken Thursday evening at the Executive Committee meeting Matthew B. Shoemake, Alantro Communications
3
Completed HRb SG Work Drafted and approved Call for Intent to Propose
Month 1998 doc.: IEEE /xxx July 2000 Completed HRb SG Work Drafted and approved Call for Intent to Propose Call will be issued on web-site and reflector assuming the PAR is approved this week Call for intent is in document 00/198 Matthew B. Shoemake, Alantro Communications John Doe, His Company
4
Informative Press Release
July 2000 Informative Press Release Drafted and approved IEEE press release announcing new PAR and TGg Approved press release is in document 00/217r1 Motion: Move to accept document 217r1 and direct the Chair of the IEEE WG to issue its contents as an IEEE press release. Matthew B. Shoemake, Alantro Communications
5
Submissions Presented to HRb SG
July 2000 Submissions Presented to HRb SG Technical Feasibility of OFDM for HRb SG, Mark Webster, Intersil, 00/203 OFDM in the 2.4GHz Band, Jan Boer, Lucent, 00/188 HRb Performance Requirements – PHY Overhead and Data Rate, Jerry Loraine, Microlinear, 00/206 Frequency Domain Modulators for b, Mark Webster, Intersil, 00/202 Report on Recent FCC Visit, Carlos Rios, LinCom, 00/230 Matthew B. Shoemake, Alantro Communications
6
HRb SG Work In Progress Drafted Proposal Selection Process
July 2000 HRb SG Work In Progress Drafted Proposal Selection Process Selection process is in document 00/209r2 Drafted Functional Requirements Functional requirements are in document 00/210r1 Drafted Comparison Criteria Comparison criteria are in document 00/211 Motion: Authorize the HRb SG to hold a series of four conference calls organized and chaired by the HRb SG chairperson, starting at 8:00am Pacific Time, and lasting a maximum of 1.5 hours each on Wednesdays July 26, August 9, August 23 and September 6, 2000 the purpose of which is to continue work on the Proposal Selection Process, Functional Requirements, and Comparison Criteria. Matthew B. Shoemake, Alantro Communications
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.