Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liaison from to Date: 11May2017 May 2017 Name

Similar presentations


Presentation on theme: "Liaison from to Date: 11May2017 May 2017 Name"— Presentation transcript:

1 Liaison from 802.15 to 802.18 Date: 11May2017 May 2017 Name
Affiliation Address Phone Jay Holcomb, Vice-Chair Itron, Inc. 2111 N. Molter Liberty Lake, WA 99019 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Jay Holcomb, Itron, Inc.

2 May 2017 Overview This document summarizes the activities of the IEEE Working Group for IEEE RR-TAG during the May 2017 IEEE 802 Interim Meeting at the Daejeon Convention Center, Daejeon, South Korea. Jay Holcomb, Itron, Inc.

3 Task Group Status (1/2) May 2017 Task Group Closing Reports:
CLOSING REPORT: TG3d 100G THZ - KURNER /0293r00 CLOSING REPORT: TG3f 60GE (60GHZ EXTENSION) - HEILE start LB CLOSING REPORT: TG4s SRU (SPECTRUM RESOURCE UTILIZATION) - HEILE not meeting CLOSING REPORT: TG4v RSGB Regional Sub-GHz band updates - HEILE not meeting CLOSING REPORT: TG7m (7r1) OWC (OPTICAL WIRELESS COMMS) - JANG /0315r00 CLOSING REPORT: TG8 PAC (PEER AWARE COMMUNICATIONS) - LEE /0310r00 CLOSING REPORT: TG12 ULI (UPPER LAYER INTERFACE) PERKINS /0263r00 CLOSING REPORT: TG13 MULTI-GIGBIT OWC JUNGNICKEL 15-17/0320r00 Jay Holcomb, Itron, Inc.

4 Study & Interest Group Status
May 2017 Study & Interest Group Status SGs CLOSING REPORT: SG 4md 15.4 REVISIONS HEILE n/a IGs CLOSING REPORT: IG DEP (DEPENDABILITY - KOHNO not meeting CLOSING REPORT: IG HRRC (HIGH RATE RAIL) - KIM /0307r00 CLOSING REPORT: IG LPWA (low power wide area) - ROBERT not meeting CLOSING REPORT: IG THZ - KURNER /0294r00 CLOSING REPORT: IG VAT (VEH. ASSIT TECH.) - JANG /0321r00 SCs CLOSING REPORT: IETF/RULES/SC-M - HEILE /0261r02 CLOSING REPORT: WNG - HEILE nothing this week Jay Holcomb, Itron, Inc.

5 Other Group Status May 2017 Liaison Reports
LIAISON REPORT - Petrick /0316r00 LIAISON REPORT - Holcomb /0302r00 LIAISON REPORT - Godfrey/Rolf verbal Jay Holcomb, Itron, Inc.

6 802.15 Meeting Close The 802.15 WG adjourned Thursday evening
May2017 Meeting Close The WG adjourned Thursday evening The next face to face meeting of the WG will be the Plenary 11 – 13 July 2017 at the Estrel Hotel, Berlin, Germany. Jay Holcomb, Itron, Inc.


Download ppt "Liaison from to Date: 11May2017 May 2017 Name"

Similar presentations


Ads by Google